place

Lapa (Line 7) (CPTM)

Companhia Paulista de Trens Metropolitanos stationsRailway stations opened in 1899
Estação Lapa EFSJ
Estação Lapa EFSJ

Lapa is a train station on CPTM Line 7-Ruby, in the district of Lapa in São Paulo.

Excerpt from the Wikipedia article Lapa (Line 7) (CPTM) (License: CC BY-SA 3.0, Authors, Images).

Lapa (Line 7) (CPTM)
Rua John Harrison, São Paulo Lapa

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Lapa (Line 7) (CPTM)Continue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N -23.517473 ° E -46.705134 °
placeShow on map

Address

Now Offices

Rua John Harrison 299
05074-080 São Paulo, Lapa
São Paulo, Brazil
mapOpen on Google Maps

Estação Lapa EFSJ
Estação Lapa EFSJ
Share experience

Nearby Places

Santa Marina (São Paulo Metro)

Santa Marina will be one of the future stations of São Paulo Metro and will belong to Line 6-Orange, which is under construction. In its first phase, with 15.9 km (9.9 mi) of extension, Line 6 should connect Brasilândia, in the North Side, to São Joaquim station of Line 1-Blue. Later, the line should connect Rodovia dos Bandeirantes to the borough of Cidade Líder, in the East Side. The station will be located in the confluence between Avenida Miguel Conejo, Rua Bonifácio Cubas and Travessa da Mona Lisa.The construction of the station began in 2016, when the opening date was estimated to mid-2020. Later, Governor Geraldo Alckmin promised the opening of the first phase of the line to 2020, time which was discarded due to a year of delay in the financing of the Federal Savings Bank, which would be used for the expropriations. In June 2016, the opening of the line was estimated for 2021, time kept in October 2017, when the resume of the construction was announced for the beginning of 2018. Currently, the construction is suspended, due to the involvement of the construction companies of the Move São Paulo consortium (Odebrecht, Queiroz Galvão, UTC Participações) in Operation Car Wash, which caused them to not get the financing of R$ 5.5 billions (US$ 1,575,344,427.58) with the Brazilian Development Bank (BNDES) for the continuity of the construction. The State Government of São Paulo is currently in negotiations with international companies, including Spanish Acciona and Chinese China Railway Construction Corporation.

Água Branca (São Paulo Metro)

Água Branca will be one of the future stations of São Paulo Metro and will belong to Line 6-Orange, which is under construction. In its first phase, with 15.9 km (9.9 mi) of extension, Line 6 should connect Brasilândia, in the North Side, to São Joaquim station of Line 1-Blue. Later, the line should connect Rodovia dos Bandeirantes to the borough of Cidade Líder, in the East Side. The station will be located in Avenida Santa Marina, next to the CPTM station.The construction of the station began in 2016, when the opening date was estimated to mid-2020. Later, Governor Geraldo Alckmin promised the opening of the first phase of the line to 2020, time which was discarded due to a year of delay in the financing of the Federal Savings Bank, which would be used for the expropriations. In June 2016, the opening of the line was estimated for 2021, time kept in October 2017, when the resume of the construction was announced for the beginning of 2018. Currently, the construction is suspended, due to the involvement of the construction companies of the Move São Paulo consortium (Odebrecht, Queiroz Galvão, UTC Participações) in Operation Car Wash, which caused them to not get the financing of R$ 5.5 billions (US$ 1,575,344,427.58) with the Brazilian Development Bank (BNDES) for the continuity of the construction. The State Government of São Paulo is currently in negotiations with international companies, including Spanish Acciona and Chinese China Railway Construction Corporation.

João Paulo I (São Paulo Metro)
João Paulo I (São Paulo Metro)

João Paulo I will be one of the future stations of São Paulo Metro and will belong to Line 6-Orange, which is under construction. In its first phase, with 15.9 km (9.9 mi) of extension, Line 6 should connect Brasilândia, in the North Side, to São Joaquim station of Line 1-Blue. Later, the line should connect Rodovia dos Bandeirantes to the borough of Cidade Líder, in the East Side. The station will be located in the confluence between Avenida Miguel Conejo, Avenida João Paulo I and Rua Baião Parente, next to Rua Ameliópolis. The construction of the station began in 2016, when the opening date was estimated to mid-2020. Later, Governor Geraldo Alckmin promised the opening of the first phase of the line to 2020, time which was discarded due to a year of delay in the financing of the Federal Savings Bank, which would be used for the expropriations. In June 2016, the opening of the line was estimated for 2021, time kept in October 2017, when the resume of the construction was announced for the beginning of 2018. Currently, the construction is suspended, due to the involvement of the construction companies of the Move São Paulo consortium (Odebrecht, Queiroz Galvão, UTC Participações) in Operation Car Wash, which caused them to not get the financing of R$ 5.5 billions (US$ 1,575,344,427.58) with the Brazilian Development Bank (BNDES) for the continuity of the construction. The State Government of São Paulo is currently in negotiations with international companies, including Spanish Acciona and Chinese China Railway Construction Corporation.