place

Subprefecture of Lapa

Subprefectures of São PauloSão Paulo (state) geography stubs
SP Lapa
SP Lapa

The Subprefecture of Lapa is one of 32 subprefectures of the city of São Paulo, Brazil. It comprises six districts: Lapa, Barra Funda, Perdizes, Vila Leopoldina, Jaguaré, and Jaguara.In the north area of Lapa, which comprises the bairros of Barra Funda, Água Branca and the "Low Lapa" (Lapa de baixo) most of the people are descendants of proletarian families who once worked in the two main railways of the city: São Paulo Railway and the Sorocabana. Today, both of these railways station have become local urban train stations. The southern area of the subprefecture, which includes the "High Lapa" (Alto da Lapa) and the bairros of Perdizes, Sumaré and Pompéia, is a high-class area and has many historic buildings, and has many descendant of the English engineers who built the railways. Also the main campus of the Pontifical Catholic University of São Paulo (PUC-SP) is located in this place, in the district of Perdizes, as well as Allianz Arena, home of the football team Palmeiras.

Excerpt from the Wikipedia article Subprefecture of Lapa (License: CC BY-SA 3.0, Authors, Images).

Subprefecture of Lapa
Rua 12 de Outubro, São Paulo Lapa

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Subprefecture of LapaContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N -23.519722222222 ° E -46.704166666667 °
placeShow on map

Address

Rua 12 de Outubro (Rua Doze de outubro)

Rua 12 de Outubro
05074-050 São Paulo, Lapa
São Paulo, Brazil
mapOpen on Google Maps

SP Lapa
SP Lapa
Share experience

Nearby Places

Santa Marina (São Paulo Metro)

Santa Marina will be one of the future stations of São Paulo Metro and will belong to Line 6-Orange, which is under construction. In its first phase, with 15.9 km (9.9 mi) of extension, Line 6 should connect Brasilândia, in the North Side, to São Joaquim station of Line 1-Blue. Later, the line should connect Rodovia dos Bandeirantes to the borough of Cidade Líder, in the East Side. The station will be located in the confluence between Avenida Miguel Conejo, Rua Bonifácio Cubas and Travessa da Mona Lisa.The construction of the station began in 2016, when the opening date was estimated to mid-2020. Later, Governor Geraldo Alckmin promised the opening of the first phase of the line to 2020, time which was discarded due to a year of delay in the financing of the Federal Savings Bank, which would be used for the expropriations. In June 2016, the opening of the line was estimated for 2021, time kept in October 2017, when the resume of the construction was announced for the beginning of 2018. Currently, the construction is suspended, due to the involvement of the construction companies of the Move São Paulo consortium (Odebrecht, Queiroz Galvão, UTC Participações) in Operation Car Wash, which caused them to not get the financing of R$ 5.5 billions (US$ 1,575,344,427.58) with the Brazilian Development Bank (BNDES) for the continuity of the construction. The State Government of São Paulo is currently in negotiations with international companies, including Spanish Acciona and Chinese China Railway Construction Corporation.

Água Branca (São Paulo Metro)

Água Branca will be one of the future stations of São Paulo Metro and will belong to Line 6-Orange, which is under construction. In its first phase, with 15.9 km (9.9 mi) of extension, Line 6 should connect Brasilândia, in the North Side, to São Joaquim station of Line 1-Blue. Later, the line should connect Rodovia dos Bandeirantes to the borough of Cidade Líder, in the East Side. The station will be located in Avenida Santa Marina, next to the CPTM station.The construction of the station began in 2016, when the opening date was estimated to mid-2020. Later, Governor Geraldo Alckmin promised the opening of the first phase of the line to 2020, time which was discarded due to a year of delay in the financing of the Federal Savings Bank, which would be used for the expropriations. In June 2016, the opening of the line was estimated for 2021, time kept in October 2017, when the resume of the construction was announced for the beginning of 2018. Currently, the construction is suspended, due to the involvement of the construction companies of the Move São Paulo consortium (Odebrecht, Queiroz Galvão, UTC Participações) in Operation Car Wash, which caused them to not get the financing of R$ 5.5 billions (US$ 1,575,344,427.58) with the Brazilian Development Bank (BNDES) for the continuity of the construction. The State Government of São Paulo is currently in negotiations with international companies, including Spanish Acciona and Chinese China Railway Construction Corporation.