place

Freguesia do Ó (São Paulo Metro)

Proposed railway stations in BrazilRailway stations scheduled to open in 2026São Paulo Metro stationsSão Paulo Metro stubs
Estação Freguesia do Ó • Linha 6 Laranja • Metrô de São Paulo • construção em janeiro 2026 • 2
Estação Freguesia do Ó • Linha 6 Laranja • Metrô de São Paulo • construção em janeiro 2026 • 2

Freguesia do Ó will be one of the future stations of São Paulo Metro and will belong to Line 6-Orange, which is under construction. In its first phase, with 15.9 km (9.9 mi) of extension, Line 6 should connect Brasilândia district, in the North Side, to São Joaquim station of Line 1-Blue. Later, the line should connect Rodovia dos Bandeirantes to the borough of Cidade Líder, in the East Side. The station will be located in the confluence between Avenida Miguel Conejo, Rua Bonifácio Cubas and Travessa da Mona Lisa. The construction of the station began in 2016, when the opening date was estimated to mid-2020. Later, Governor Geraldo Alckmin promised the opening of the first phase of the line to 2020, time which was discarded due to a year of delay in the financing of the Federal Savings Bank, which would be used for the expropriations. In June 2016, the opening of the line was estimated for 2021, time kept in October 2017, when the resume of the construction was announced for the beginning of 2018. Currently, the construction is suspended, due to the involvement of the construction companies of the Move São Paulo consortium (Odebrecht, Queiroz Galvão, UTC Participações) in Operation Car Wash, which caused them to not get the financing of R$ 5.5 billions (US$ 1,575,344,427.58) with the Brazilian Development Bank (BNDES) for the continuity of the construction. The State Government of São Paulo is currently in negotiations with international companies, including Spanish Acciona and Chinese China Railway Construction Corporation.

Excerpt from the Wikipedia article Freguesia do Ó (São Paulo Metro) (License: CC BY-SA 3.0, Authors, Images).

Freguesia do Ó (São Paulo Metro)
Avenida Miguel Conejo, São Paulo Parque Monteiro Soares

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Freguesia do Ó (São Paulo Metro)Continue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N -23.50236 ° E -46.69389 °
placeShow on map

Address

Avenida Miguel Conejo

Avenida Miguel Conejo
02729-080 São Paulo, Parque Monteiro Soares
São Paulo, Brazil
mapOpen on Google Maps

Estação Freguesia do Ó • Linha 6 Laranja • Metrô de São Paulo • construção em janeiro 2026 • 2
Estação Freguesia do Ó • Linha 6 Laranja • Metrô de São Paulo • construção em janeiro 2026 • 2
Share experience

Nearby Places

João Paulo I (São Paulo Metro)
João Paulo I (São Paulo Metro)

João Paulo I will be one of the future stations of São Paulo Metro and will belong to Line 6-Orange, which is under construction. In its first phase, with 15.9 km (9.9 mi) of extension, Line 6 should connect Brasilândia, in the North Side, to São Joaquim station of Line 1-Blue. Later, the line should connect Rodovia dos Bandeirantes to the borough of Cidade Líder, in the East Side. The station will be located in the confluence between Avenida Miguel Conejo, Avenida João Paulo I and Rua Baião Parente, next to Rua Ameliópolis. The construction of the station began in 2016, when the opening date was estimated to mid-2020. Later, Governor Geraldo Alckmin promised the opening of the first phase of the line to 2020, time which was discarded due to a year of delay in the financing of the Federal Savings Bank, which would be used for the expropriations. In June 2016, the opening of the line was estimated for 2021, time kept in October 2017, when the resume of the construction was announced for the beginning of 2018. Currently, the construction is suspended, due to the involvement of the construction companies of the Move São Paulo consortium (Odebrecht, Queiroz Galvão, UTC Participações) in Operation Car Wash, which caused them to not get the financing of R$ 5.5 billions (US$ 1,575,344,427.58) with the Brazilian Development Bank (BNDES) for the continuity of the construction. The State Government of São Paulo is currently in negotiations with international companies, including Spanish Acciona and Chinese China Railway Construction Corporation.

Santa Marina (São Paulo Metro)

Santa Marina will be one of the future stations of São Paulo Metro and will belong to Line 6-Orange, which is under construction. In its first phase, with 15.9 km (9.9 mi) of extension, Line 6 should connect Brasilândia, in the North Side, to São Joaquim station of Line 1-Blue. Later, the line should connect Rodovia dos Bandeirantes to the borough of Cidade Líder, in the East Side. The station will be located in the confluence between Avenida Miguel Conejo, Rua Bonifácio Cubas and Travessa da Mona Lisa.The construction of the station began in 2016, when the opening date was estimated to mid-2020. Later, Governor Geraldo Alckmin promised the opening of the first phase of the line to 2020, time which was discarded due to a year of delay in the financing of the Federal Savings Bank, which would be used for the expropriations. In June 2016, the opening of the line was estimated for 2021, time kept in October 2017, when the resume of the construction was announced for the beginning of 2018. Currently, the construction is suspended, due to the involvement of the construction companies of the Move São Paulo consortium (Odebrecht, Queiroz Galvão, UTC Participações) in Operation Car Wash, which caused them to not get the financing of R$ 5.5 billions (US$ 1,575,344,427.58) with the Brazilian Development Bank (BNDES) for the continuity of the construction. The State Government of São Paulo is currently in negotiations with international companies, including Spanish Acciona and Chinese China Railway Construction Corporation.

Água Branca (São Paulo Metro)

Água Branca will be one of the future stations of São Paulo Metro and will belong to Line 6-Orange, which is under construction. In its first phase, with 15.9 km (9.9 mi) of extension, Line 6 should connect Brasilândia, in the North Side, to São Joaquim station of Line 1-Blue. Later, the line should connect Rodovia dos Bandeirantes to the borough of Cidade Líder, in the East Side. The station will be located in Avenida Santa Marina, next to the CPTM station.The construction of the station began in 2016, when the opening date was estimated to mid-2020. Later, Governor Geraldo Alckmin promised the opening of the first phase of the line to 2020, time which was discarded due to a year of delay in the financing of the Federal Savings Bank, which would be used for the expropriations. In June 2016, the opening of the line was estimated for 2021, time kept in October 2017, when the resume of the construction was announced for the beginning of 2018. Currently, the construction is suspended, due to the involvement of the construction companies of the Move São Paulo consortium (Odebrecht, Queiroz Galvão, UTC Participações) in Operation Car Wash, which caused them to not get the financing of R$ 5.5 billions (US$ 1,575,344,427.58) with the Brazilian Development Bank (BNDES) for the continuity of the construction. The State Government of São Paulo is currently in negotiations with international companies, including Spanish Acciona and Chinese China Railway Construction Corporation.