The Waterfront Barrow-in-Furness
The Waterfront Barrow-in-Furness is a £200 million development under construction in and around the Port of Barrow, England. The site covers an area of some 400 acres (160 ha) and was due for completion in 2020. The internal road network is already complete, with construction of a large business park complex ongoing and work on a 400-berth marina and 650 home Marina Village due to start thereafter. In 2010, The Waterfront Barrow-in-Furness ranked as the ninetieth most costly regeneration project in the United Kingdom by Regeneration & Renewal. Progress on the project stalled between 2010 and 2016 due to complications with funding following the disabandonment of the North West Regional Development Agency. BAE Systems opened a large logistics warehouse named the Resolution Building on Dova Way within the designated Business Park Area in October 2016, while and construction of a new access road from Salthouse Road to the Marina Village commenced in May 2017.
Excerpt from the Wikipedia article The Waterfront Barrow-in-Furness (License: CC BY-SA 3.0, Authors).The Waterfront Barrow-in-Furness
Buccleuch Dock Road,
Geographical coordinates (GPS) Address Nearby Places Show on map
Continue reading on Wikipedia
Geographical coordinates (GPS)
Latitude | Longitude |
---|---|
N 54.1012 ° | E -3.2192 ° |
Address
Shipyard Junction
Buccleuch Dock Road
LA14 1AF , Barrow Island
England, United Kingdom
Open on Google Maps