place

Todd Brook

Cheshire geography stubsDerbyshire geography stubsEngland river stubsGoyt catchmentRivers of Cheshire
Rivers of Derbyshire
Todd brook 077820 71f5b3dc
Todd brook 077820 71f5b3dc

Todd Brook is a small river running through the English counties of Cheshire and Derbyshire. The Brook rises beneath Shining Tor on the border between the two counties and flows northwards through east Cheshire, passing by Jenkin Chapel, Windgather Rocks and Kettleshulme before turning east, forming the border between Cheshire and Derbyshire for a short distance before filling Toddbrook Reservoir in Derbyshire. The brook flows into the River Goyt at Whaley Bridge. The brook's Environment Agency pollution classification changed from good to moderate in 2014.

Excerpt from the Wikipedia article Todd Brook (License: CC BY-SA 3.0, Authors, Images).

Todd Brook
Reservoir Road, High Peak Hockerley

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Todd BrookContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 53.3265 ° E -1.9879 °
placeShow on map

Address

Reservoir Road
SK23 7BL High Peak, Hockerley
England, United Kingdom
mapOpen on Google Maps

Todd brook 077820 71f5b3dc
Todd brook 077820 71f5b3dc
Share experience

Nearby Places

Toddbrook Reservoir
Toddbrook Reservoir

Toddbrook Reservoir, a feeder for the Peak Forest Canal, opened in 1838. It is above the town of Whaley Bridge in the High Peak area of Derbyshire, England. The reservoir is a Site of Special Scientific Interest (SSSI) providing habitats for herons, ducks and other animals and fish, while rare mosses and liverworts grow on its shores, particularly short-lived species that grow on seasonally exposed mud. The reservoir is used for sailing and angling. The Peak District Boundary Walk runs around the eastern end of the reservoir. The reservoir is owned by the Canal & River Trust and, like the nearby Combs Reservoir, is a feeder reservoir for the Peak Forest Canal. The feeder runs through Whaley Bridge, and with the Combs feed enters the canal system in a pool close to the transhipment shed at the Whaley Bridge canal basin. The reservoir is fed from the Todd Brook, a stream which has a catchment area of around 1,700 hectares (4,200 acres) including the moorland on Shining Tor and farmland around Kettleshulme village. Water enters the reservoir on its north bank via a small waterfall. The first several inches of water do not flow into the reservoir but flow down the reservoir's run-off into the River Goyt. The reservoir often receives little or no inflow during periods when rainfall does not allow the level to exceed the barrier, and this often affects the reservoir's water level, particularly in the summer months. The reservoir's dam is built from earth with a puddle clay core. The embankment is straight in plan and approximately 310m long. The average crest level is 187.3 metres (615 ft) AOD. In August 2019, concrete panels on its spillway were dislodged after heavy rain, triggering the evacuation of parts of Whaley Bridge and the surrounding area due to the possibility of the dam collapsing.

Bugsworth Basin
Bugsworth Basin

Bugsworth Basin is a canal basin at the terminus of the Peak Forest Canal at Buxworth (formerly Bugsworth) in the valley of the Black Brook, close to Whaley Bridge. It was once a busy interchange with the Peak Forest Tramway, for the transport of limestone and burnt lime.Work on the restoration of the derelict Bugsworth Basin, a Scheduled Ancient Monument since 1977, commenced in 1968. Volunteers of the Inland Waterways Protection Society (IWPS) helped by the Waterway Recovery Group (WRG) and many locals restored parts of this important site over three decades. The IWPS obtained a 50-year lease in 1992, which allowed them to restore, manage and operate the basin. Funding for the improvements came from British Waterways, the European Regional Development Fund and a Derelict Land Grant from Derbyshire County Council. The basin was reopened to boats at Easter 1999, and a significant increase in the use of the canal occurred. However, this was the first time that powered boats had used the basin, and the dry-stone walling with clay puddling deteriorated rapidly. Walls collapsed, there were several near breaches, and a breach resulted in the basin closing again in October 1999. British Waterways restored pedestrian access to the basin by carrying out emergency repairs.In 2005 the basin reopened to boat traffic after a £1.2 million restoration, undertaken by British Waterways working with the IWPS. Work included sealing the bottom of the basin to stop leakage, stonework repair and environmental measures to conserve the site's protected water vole population. Although restoration and reopening of the basin has been achieved, waterways enthusiasts want to make future improvements and developments. These include an interpretative exhibition about Bugsworth's history and reopening part of the tramway. Bugsworth Basin was officially reopened on 26 March 2005 when 94 narrowboats attended the opening ceremony. The opening was performed by Tom Levitt, the then member of parliament for High Peak.The basin is on the fringe of the Peak District National Park and the purpose of the restoration was to develop this industrial heritage site as a tourist centre.