place

KSVR (FM)

Community radio stations in the United StatesRadio stations established in 1973Radio stations in Washington (state)Regional Mexican radio stations in the United StatesWashington (state) radio station stubs
KSVR FM new logo
KSVR FM new logo

KSVR (91.7 FM) is a radio station broadcasting a variety and Regional Mexican format. Licensed to broadcast from Mount Vernon, Washington, United States, the station serves all of Skagit County; the station is currently owned by Board of Trustees of Skagit Valley College. The station broadcasts from Little Mountain, southeast of downtown Mount Vernon.

Excerpt from the Wikipedia article KSVR (FM) (License: CC BY-SA 3.0, Authors, Images).

KSVR (FM)
Ridge Trail,

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: KSVR (FM)Continue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 48.39675 ° E -122.30847222222 °
placeShow on map

Address

Ridge Trail

Ridge Trail
98274
Washington, United States
mapOpen on Google Maps

KSVR FM new logo
KSVR FM new logo
Share experience

Nearby Places

I-5 Skagit River bridge collapse
I-5 Skagit River bridge collapse

On May 23, 2013, at approximately 7:00 pm PDT, a span of the bridge carrying Interstate 5 over the Skagit River in the U.S. state of Washington collapsed. Three people in two different vehicles fell into the river below and were rescued by boat, escaping serious injury. The cause of the catastrophic failure was determined to be an oversize load striking several of the bridge's overhead support beams, leading to an immediate collapse of the northernmost span.The through-truss bridge was built in 1955 and connects the Skagit County cities of Mount Vernon and Burlington, providing a vital link between Vancouver, British Columbia and Seattle. It consists of four consecutive spans that are structurally independent. Only the northernmost span collapsed into the river; the adjacent span also sustained impact damage from the same vehicle, but not severe enough to result in a collapse. The overhead support structure was known to have been struck by a truck as recently as October 2012. Not long before the accident, the bridge had been evaluated as safe. Although not structurally deficient, it was considered "functionally obsolete", meaning it did not meet current design standards. The bridge's design was "fracture-critical," meaning that it did not have redundant structural members to protect its structural integrity in the event of a failure of one of the bridge's support members. Within a month of the collapse, two temporary bridges were erected and placed on the failed span's support columns while the permanent bridge was built. In September 2013, the permanent bridges were installed and work began to prevent similar failures of the remaining three spans.