place

Lot, Belgium

Flemish Brabant geography stubsPopulated places in Flemish Brabant
LotKerk
LotKerk

Lot is a village in the municipality of Beersel, Belgium. A formerly autonomous village, it was merged with the villages of Beersel, Alsemberg, Dworp, and Huizingen to create the Beersel municipality. On the northwestern edge of Beersel, it is bordered by the Brussels–Charleroi Canal.Notable residents include Renaat Van Elslande, the former mayor of Lot from 1947 to 1976. He went on to become the first Flemish foreign minister in Belgium's history.

Excerpt from the Wikipedia article Lot, Belgium (License: CC BY-SA 3.0, Authors, Images).

Lot, Belgium
Beverbeemd, Beersel

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Lot, BelgiumContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 50.766666666667 ° E 4.2666666666667 °
placeShow on map

Address

Beverbeemd

Beverbeemd
1651 Beersel (Sint-Pieters-Leeuw)
Flemish Brabant, Belgium
mapOpen on Google Maps

LotKerk
LotKerk
Share experience

Nearby Places

Halle train collision

The Halle train collision (also known as the Buizingen train collision) was a collision between two NMBS/SNCB passenger trains carrying a combined 250 to 300 people in Buizingen, in the municipality of Halle, Flemish Brabant, Belgium, on 15 February 2010. The accident occurred in snowy conditions at 08:28 CET (07:28 UTC), during rush hour, on railway line 96 (Brussels–Quévy) about 12 kilometres (7.5 mi) from Brussels between P-train E3678 from Leuven to Braine-le-Comte (a local rush hour train) and IC-train E1707 from Quiévrain to Liège (an intercity train). A third train was able to come to a stop just in time. The collision killed 19 people and injured 171, making it the deadliest rail accident in Belgium in over fifty years.Three investigations were held in the aftermath of the accident: a parliamentary investigation to review railway safety, a safety investigation for the purpose of preventing future accidents, and a judicial investigation into whether any laws were broken. The cause of the accident was determined to be a human error on behalf of the driver of the train from Leuven, who passed a red signal without authorization. This was contested by the train driver, despite the confirmations of the safety and judicial investigations. Another contributing factor was the absence of TBL 1+ on the train that passed the red signal. If TBL 1+ had been installed the accident may have been avoided. Because of multiple difficulties the judicial investigation lasted for years, causing the train driver, the NMBS/SNCB, and Infrabel (the infrastructure operator) to be summoned to court only in June 2018. The disaster led to the accelerated rollout of TBL 1+ on the entire Belgian railway network. The last NMBS/SNCB train was fitted with the system in November 2016.