place

Mount Elliott Tool and Die

1938 establishments in MichiganAutomotive factory stubsChrysler factoriesIndustrial buildings and structures in DetroitMotor vehicle assembly plants in Michigan
Mount Elliott Tool and Die Chrysler plant
Mount Elliott Tool and Die Chrysler plant

Mount Elliott Tool and Die is a Stellantis North America automotive stamping plant in Detroit, Michigan that produces Stamping Dies, Checking Fixtures, Stamping Fixtures. It was built in 1938 by the Briggs Manufacturing Company. Chrysler purchased the plant in 1956 and it became Outer Drive Stamping plant. The facility became a tool and die plant after Vernor Tool & Die closed in 1983 and moved their operations there. The facility was then renamed Outer Drive Manufacturing Technology Center. After the "Pilot Operations" and "Advanced Stamping Manufacturing Engineering" were moved to Chrysler Headquarters in Auburn Hills, Michigan in the 1980s, the facility was renamed "Mt. Elliott Tool and Die". Mount Elliott currently employs around 300 people and is home to UAW Local 212. As of late 2018 Mount Elliot is currently idled.

Excerpt from the Wikipedia article Mount Elliott Tool and Die (License: CC BY-SA 3.0, Authors, Images).

Mount Elliott Tool and Die
East Outer Drive, Detroit

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Mount Elliott Tool and DieContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 42.4416 ° E -83.0403 °
placeShow on map

Address

East Outer Drive

East Outer Drive
48234 Detroit
Michigan, United States
mapOpen on Google Maps

Mount Elliott Tool and Die Chrysler plant
Mount Elliott Tool and Die Chrysler plant
Share experience

Nearby Places

Mound Road Engine

Mound Road Engine was a Chrysler automobile engine factory in Detroit. Chrysler acquired the plant as part of its purchase of the Briggs Manufacturing Company in 1953. The plant was closed by DaimlerChrysler in 2002, with production shifting to the Mack Avenue Engine Complex. Chrysler briefly used the facility for making aircraft components, and transferred it to the Plymouth division in 1954. Plymouth added 71,000 square feet (6,600 m2) to the existing plant, bringing its size to just over 539,000 sq ft (50,100 m2). By the time engine production began in 1955, it housed what was at the time the world's longest assembly line.The factory was home to Chrysler's production of the small-block Chrysler A engine, a V8 used in Plymouth vehicles, then later the LA V8, or "Light A", as it weighed nearly 50 pounds less than the "A" engine it was closely based on. Later, the plant built the LA-based Magnum V10 engine. The factory was in operation for 47 years. The facility was torn down in late 2003 and the land paved over because it was cheaper to pay taxes on a parking lot than an empty building. The newly paved area, as well as the old employee parking lots, are now used to store vehicles that were manufactured at Warren Truck Assembly before shipping them to dealerships. Mount Elliott Tool and Die, another Chrysler facility, is located directly behind what used to be the Mound Road Engine plant. The facility was located at 20300 Mound Road, Detroit, Michigan.