place

Iztapasauria

2021 establishments in MexicoAmusement park stubsAmusement parks in Mexico CityAmusement parks opened in 2021Animal theme parks
Operating amusement parksUse American English from July 2022
RodadaIztapasauria20220327 ohs14
RodadaIztapasauria20220327 ohs14

Iztapasauria (also branded as IztapaSauria) is a free-entry dinosaur theme park in Iztapalapa, Mexico City. It opened on 4 December 2021 inside the Deportivo Utopía Santa Cruz Meyehualco sports center. The theme park has several green areas decorated as a Mezozoic jungle in which there are thirteen animatronic dinosaurs.

Excerpt from the Wikipedia article Iztapasauria (License: CC BY-SA 3.0, Authors, Images).

Iztapasauria
Calzada Ermita Iztapalapa, Mexico City

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: IztapasauriaContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 19.344166666667 ° E -99.048055555556 °
placeShow on map

Address

Calzada Ermita Iztapalapa
09290 Mexico City
Mexico
mapOpen on Google Maps

RodadaIztapasauria20220327 ohs14
RodadaIztapasauria20220327 ohs14
Share experience

Nearby Places

Mexico City Metro overpass collapse
Mexico City Metro overpass collapse

On 3 May 2021, at 22:22 CDT (UTC−5), an overpass in the borough of Tláhuac carrying Line 12 of the Mexico City Metro collapsed beneath a passing train. The overpass and the last two cars of the train fell onto Tláhuac Avenue near Olivos station, killing 26 people and injuring 98 others. It was the Metro's deadliest accident in almost fifty years. The line experienced technical and structural problems that led to a partial closure of the elevated section where the accident occurred between 2014 and 2015. An earthquake in 2017 further damaged the span; although it was repaired within a few months, residents reported problems still existed years later. The line was announced in 2007 as an underground line with the possibility of operating rubber-tired trains because of the instability of the city's soil. The line was scheduled to be opened by 2010 but due to the budget and time constraints, the project was modified to operate both underground and overground with steel-wheeled trains, which researchers have named as one of the causes of track instabilities and damage since the beginning of the line's operations. Empresas ICA, the company that built the system's other lines, constructed it with Alstom Mexicana and Grupo Carso—the latter owned by Carlos Slim. Claudia Sheinbaum, mayor of the city, hired the Norwegian risk management firm Det Norske Veritas (DNV) to investigate the causes of the collapse; preliminary investigations found it was related to deficiencies in the construction of the bridge, and a lack of functional studs and poor-quality welds that led to fatigue in the collapsed beam. Further investigations led them to conclude the bridge was designed and built without quality standards, that the construction and the line's design changes had been inadequately supervised, that there was a lack of fixing and safety elements, and that periodic maintenance checks that would have detected the girder buckling had not been done—the last statement being contested by the city government. Carso, the company responsible for the construction of the collapsed section, denied any wrongdoing but Slim agreed with the government of Mexico to repair the section free of charge. In December 2021, the office of the city's attorney general filed charges against ten former officials—including the project director—who were involved in the construction and supervision of the project in December 2021; as of March 2023, these are awaiting trial for manslaughter, injury, and property damage.