place

Cockburn Central railway station

Bus stations in Perth, Western AustraliaMandurah lineRailway stations in Australia opened in 2007Railway stations in Perth, Western AustraliaTransperth railway stations in highway medians
Use Australian English from January 2012
Cockburn Central stn western entrance
Cockburn Central stn western entrance

Cockburn Central station ( KOH-bərn) is a bus and railway station on the Transperth network. It is located at the juncture of the Mandurah and – once completed – Thornlie lines, 20.5 kilometres (12.7 mi) from Perth station inside the median strip of the Kwinana Freeway serving the suburb of Cockburn Central.

Excerpt from the Wikipedia article Cockburn Central railway station (License: CC BY-SA 3.0, Authors, Images).

Cockburn Central railway station
Kwinana Freeway, City Of Cockburn

Geographical coordinates (GPS) Address External links Nearby Places
placeShow on map

Wikipedia: Cockburn Central railway stationContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N -32.125279 ° E 115.858355 °
placeShow on map

Address

Cockburn Central

Kwinana Freeway
6164 City Of Cockburn, Cockburn Central
Western Australia, Australia
mapOpen on Google Maps

linkWikiData (Q5139549)
linkOpenStreetMap (662852799)

Cockburn Central stn western entrance
Cockburn Central stn western entrance
Share experience

Nearby Places

Aubin Grove railway station
Aubin Grove railway station

Aubin Grove railway station (officially Aubin Grove Station) is a commuter railway station serving Atwell, Aubin Grove, Hammond Park and Success, which are suburbs of Perth, Western Australia. It is on the Mandurah line, which is part of the Transperth network, and is located immediately north of Russell Road in the median of the Kwinana Freeway. It has two platform faces on a singular island platform, which is linked to either side of the freeway by a pedestrian overpass. Services run every 10 minutes during peak and every 15 minutes between peak. The journey to Perth railway station is 23.8 kilometres (14.8 mi) and takes 21 minutes. The station has a bus interchange with four bus stands and seven regular bus routes. Construction of the station was promised by both major political parties ahead of the 2013 Western Australian state election. A tender was released for the station's construction in July 2014, with a projected cost of $80 million for the whole project, including the purchase of two Transperth B-series trains. The design contract was awarded in February 2015 to a joint venture between Coniglio Ainsworth Architects and M. P. S. Architects. The scope of the project was broadened in April 2015 to include the widening of the Russell Road bridge over the freeway, which increased the project budget to $105 million. Construction on the station began in March 2016, and it was opened on 23 April 2017, with the final cost being $125 million.