place

Success Park 'n' Ride

Bus stations in Perth, Western AustraliaFormer bus stationsPages with no open date in Infobox station
Transperth Success Park 'n' Ride
Transperth Success Park 'n' Ride

Success Park 'n' Ride was a Transperth bus station located next to the current Cockburn Central Train/Bus Interchange. It was established on 21 March 1999 and decommissioned on 22 December 2007. After that it was superseded by its nearby station in Cockburn Central.

Excerpt from the Wikipedia article Success Park 'n' Ride (License: CC BY-SA 3.0, Authors, Images).

Success Park 'n' Ride
Gateways Shopping Centre North Access, City Of Cockburn

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Success Park 'n' RideContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N -32.1308 ° E 115.8555 °
placeShow on map

Address

Gateways Shopping Centre North Access
6164 City Of Cockburn, Success
Western Australia, Australia
mapOpen on Google Maps

Transperth Success Park 'n' Ride
Transperth Success Park 'n' Ride
Share experience

Nearby Places

Aubin Grove railway station
Aubin Grove railway station

Aubin Grove railway station (officially Aubin Grove Station) is a commuter railway station serving Atwell, Aubin Grove, Hammond Park and Success, which are suburbs of Perth, Western Australia. It is on the Mandurah line, which is part of the Transperth network, and is located immediately north of Russell Road in the median of the Kwinana Freeway. It has two platform faces on a singular island platform, which is linked to either side of the freeway by a pedestrian overpass. Services run every 10 minutes during peak and every 15 minutes between peak. The journey to Perth railway station is 23.8 kilometres (14.8 mi) and takes 21 minutes. The station has a bus interchange with four bus stands and seven regular bus routes. Construction of the station was promised by both major political parties ahead of the 2013 Western Australian state election. A tender was released for the station's construction in July 2014, with a projected cost of $80 million for the whole project, including the purchase of two Transperth B-series trains. The design contract was awarded in February 2015 to a joint venture between Coniglio Ainsworth Architects and M. P. S. Architects. The scope of the project was broadened in April 2015 to include the widening of the Russell Road bridge over the freeway, which increased the project budget to $105 million. Construction on the station began in March 2016, and it was opened on 23 April 2017, with the final cost being $125 million.