place

Dawson County High School (Dawsonville, Georgia)

Educational institutions in the United States with year of establishment missingGeorgia (U.S. state) school stubsPublic high schools in Georgia (U.S. state)

Dawson County High School is the public high school of Dawsonville, Georgia, United States.It enrolls approximately 800 students in grades 10, 11, and 12. In the 2017–2018 school year, the school began serving only grades 10–12, with grade 9 moving to the Dawson County Junior High School. DCHS students and staff moved into the present facility (145,000 square foot, situated on 60 acres) in December 1997. Health and medical instructional facilities, as well as 12 new classrooms (10,000 square feet) were added in August 2004. In 2016, the school added a $13 million "Performing Arts Center". A $1 million JROTC building was constructed in 2018. A "College and Career Academy" facility was also built in 2019. The principal is Michael Negley. The school employs a full-time school nurse and a School Resource Officer (SRO). More than 60 percent of the school's staff holds a master's degree or higher. Currently there are over 70 certified personnel on staff at DCHS. The school's teams compete as the Tigers. Sports at Dawson County High include softball, football, wrestling, track, JROTC Raiders, and basketball.The school also has a Fine Arts program, including Band, Drama, Chorus and Art classes. Extracurricular programs within these classes include the Dawson County Tiger Pride Marching Band and the Chamber Singers.

Excerpt from the Wikipedia article Dawson County High School (Dawsonville, Georgia) (License: CC BY-SA 3.0, Authors).

Dawson County High School (Dawsonville, Georgia)
Perimeter Road,

Geographical coordinates (GPS) Address Phone number Website Nearby Places
placeShow on map

Wikipedia: Dawson County High School (Dawsonville, Georgia)Continue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 34.414166666667 ° E -84.103055555556 °
placeShow on map

Address

Dawson County High School

Perimeter Road 1665
30534
Georgia, United States
mapOpen on Google Maps

Phone number
Dawson County Schools

call+1(706)2656555

Website
dawsondchs.ss7.sharpschool.com

linkVisit website

Share experience

Nearby Places

Dawson Forest
Dawson Forest

Dawson Forest is a 10,130-acre (41.0 km2) public-use forest located in Dawson County, Georgia, southwest of Dawsonville. It is owned by the city of Atlanta, but is considered a state forest, as it is managed by the Georgia Forestry Commission.It was purchased in 1971 from Lockheed, and was the previous site of the Georgia Nuclear Aircraft Laboratory (GNAL). The property is currently referred to as the Dawson Forest City of Atlanta Tract and managed by the Georgia Forestry Commission with a trail system open to the public. The tract is located approximately ten miles from the end of limited access on Georgia 400 in Cumming. An area of 3 acres (12,000 m2) previously occupied by GNAL was restricted following 1978 testing which found residual nuclear radiation from the experiments performed there. Subsequent studies in 1991 and 1997 found radiation levels to be at or slightly above normal background radiation levels. The property also encompasses Amicalola Creek, which various groups are lobbying to be designated as a scenic river, and which flows over Amicalola Falls within Amicalola Falls State Park. It was intended and retained by the city as a potential site for Atlanta's second airport, however in late summer 2009 it was made known that part may be used for the Shoal Creek Reservoir, a reservoir that would send water mainly to the city of Atlanta system, at its water works in Sandy Springs. However, this 38-mile (61 km) pipeline would result in an interbasin transfer from the Etowah River to the Chattahoochee River, which is currently prohibited by the metro Atlanta water district, and would leave less water in Lake Allatoona. Additionally, Alabama has sued to stop nearly everything Georgia has tried to do with the upstream water supply, including the Hickory Log Creek reservoir. In 2009, it was estimated that these lawsuits prevented permitting and construction that would take only four years. The lake would be 2,000 acres (8.1 km2), leaving the remainder as forest.