place

Berkshire Wind Power Project

Buildings and structures in Berkshire County, MassachusettsWind farms in Massachusetts

The Berkshire Wind Power Project is a wind farm on Brodie Mountain in Hancock, Massachusetts. Owned and operated by the Berkshire Wind Power Cooperative Corporation, it is the second largest wind farm in Massachusetts, with 12 GE 1.5 MW wind turbines and a total installed capacity of 19.6 MW. The Berkshire wind power project became fully operational in 2011, and provides enough electricity to power 7,800 homes annually.

Excerpt from the Wikipedia article Berkshire Wind Power Project (License: CC BY-SA 3.0, Authors).

Berkshire Wind Power Project

Geographical coordinates (GPS) Address Website Nearby Places
placeShow on map

Wikipedia: Berkshire Wind Power ProjectContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 42.579166666667 ° E -73.273888888889 °
placeShow on map

Address

Hancock



Massachusetts, United States
mapOpen on Google Maps

Website
town.hancock.ma.us

linkVisit website

Share experience

Nearby Places

Jiminy Peak (ski area)
Jiminy Peak (ski area)

Jiminy Peak is a mid-sized alpine ski resort in the northeastern United States, located in western Massachusetts in the Taconic Mountains at Hancock, northwest of nearby Pittsfield. The summit of Jiminy Peak, which includes the Hendricks Summit Lodge, is located in Lanesborough. The mountain is owned by Och-Ziff Capital Management but the operating company is owned and managed by Brian Fairbank, the longtime former owner of the Resort. During the winter Jiminy Peak offers activities for the whole family, including skiing, snowboarding, outdoor pools, and various restaurants. There are 45 trails and nine lifts, including a six-person, high speed chairlift. In the summer additional activities are offered at Mountain Adventure Park, such as an alpine super slide, mountain coaster, hiking, and mountain biking. The Aerial Adventure Park is a challenge course up in the trees. Five levels provide both physical and mental challenges for all levels. Courses range from 15–50 feet (5–15 m) in the air. Jiminy Peak has installed the second mountain coaster in the country, the first on the East Coast, and is the home of the nation's first Alpine Super Slide (June 1977). In August 2007, Jiminy became the first private U.S. business to invest in its own megawatt class wind turbine. The turbine generates approximately 35% of the annual energy used at the resort. The winds blow strongest in the winters, which is when the resort uses the most energy, for lifts and snowmaking. This is the largest commitment in Jiminy Peak's ongoing environmental sustainability efforts. In February 2012, the Resort installed a CoGeneration Unit in the Country Inn to provide both heat and hot water to the hotel. In the past decade, the mountain has been increasingly developed for real estate, as the demand for housing and activities has also increased. The mountain has 15,000 square feet (1,400 m2) of meeting space for meetings, conferences, weddings, parties, and other events.