place

Christ Church, Thornton

Church of England church buildings in LancashireChurches in the Borough of WyreDiocese of BlackburnGothic Revival architecture in LancashireGothic Revival church buildings in England
Paley and Austin buildings
Christchurch,thornton,uk
Christchurch,thornton,uk

Christ Church is in Meadows Avenue, Thornton, Lancashire, England. It is an active Anglican parish church in the deanery of Poulton, the archdeaconry of Lancaster, and the diocese of Blackburn.

Excerpt from the Wikipedia article Christ Church, Thornton (License: CC BY-SA 3.0, Authors, Images).

Christ Church, Thornton
Meadows Avenue, Borough of Wyre Burn Naze

Geographical coordinates (GPS) Address External links Nearby Places
placeShow on map

Wikipedia: Christ Church, ThorntonContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 53.8774 ° E -3.0218 °
placeShow on map

Address

Christ Church

Meadows Avenue
FY5 2TW Borough of Wyre, Burn Naze
England, United Kingdom
mapOpen on Google Maps

linkWikiData (Q5108719)
linkOpenStreetMap (882287056)

Christchurch,thornton,uk
Christchurch,thornton,uk
Share experience

Nearby Places

Norcross Roundabout
Norcross Roundabout

Norcross Roundabout is a major traffic roundabout in the English village of Thornton, Lancashire. It was built at the junction of the A585, the B5268 Fleetwood Road South and Norcross Lane. As of 2020, an average of 28,000 vehicles utilise the roundabout each day.The roundabout separates Thornton, to the north and northeast, from an area known as Norcross, beyond the roundabout to the southwest, and from Carleton to the south and southeast. It is part of a section of the A585 called Amounderness Way. It is one of five roundabouts on Amounderness Way, the others being (from the southeast to the northwest): the Victoria Road Roundabout, between Thornton and Cleveleys; and three in Fleetwood, shortly before the road's northern terminus. The one to the east of Norcross Roundabout, known as the River Wyre Roundabout, was removed in 2021.A major revamp of the roundabout, undertaken between July 2019 and April 2020, was described by motorists after its completion as "total hell", with a lack of signage cited as the main reason. Despite this, Carnell, the contractors who carried out the project, were shortlisted for Team of the Year at the national Chartered Institution of Highways and Transportation Awards. The project increased the size of the roundabout, including widening its approaches, as well as adding traffic lights. The project cost £12.3 million, funded by a national £220 million congestion relief programme.Also in 2020, a study by Reach Data Unit named Norcross Roundabout the second-most-dangerous roundabout in Lancashire, after the A589 roundabout in Morecambe.