place

Volkswagen Chattanooga Assembly Plant

2011 establishments in TennesseeBuildings and structures in Chattanooga, TennesseeEconomy of Chattanooga, TennesseeMotor vehicle assembly plants in TennesseeUse American English from July 2022
Use mdy dates from September 2012Volkswagen Group factories
Volkswagen logo 2019
Volkswagen logo 2019

The Volkswagen Chattanooga Assembly Plant (or Chattanooga Operations LLC) is an American automobile assembly plant in Chattanooga, Tennessee. The plant was formally announced in July 2008 and was formally inaugurated in May 2011.Production began in April 2011 with the model year 2012 Passat B7 (initially called the Passat NMS (New Midsize Sedan)), tailored to the US market, with a projected annual production of 150,000 cars. Passat production ended in December, 2021.Production of the Volkswagen Atlas commenced in 2017. Production of the electric Volkswagen ID.4 commenced July 26, 2022.

Excerpt from the Wikipedia article Volkswagen Chattanooga Assembly Plant (License: CC BY-SA 3.0, Authors, Images).

Volkswagen Chattanooga Assembly Plant
Tech. Ctr. Road 1-1, Chattanooga

Geographical coordinates (GPS) Address External links Nearby Places
placeShow on map

Wikipedia: Volkswagen Chattanooga Assembly PlantContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 35.080286111111 ° E -85.135555555556 °
placeShow on map

Address

Volkswagen Group of America

Tech. Ctr. Road 1-1
37416 Chattanooga
Tennessee, United States
mapOpen on Google Maps

linkWikiData (Q1460483)
linkOpenStreetMap (114453087)

Volkswagen logo 2019
Volkswagen logo 2019
Share experience

Nearby Places