place

Irakleio metro station

1957 establishments in GreeceAthens Metro stationsBuildings and structures in North AthensGreek railway station stubsIrakleio, Attica
Pages with no open date in Infobox stationPiraeus, Athens and Peloponnese RailwaysRailway stations in Greece opened in the 1950sRailway stations opened in 1957Transport in North Athens
Irakleio station
Irakleio station

Irakleio (Greek: Ηράκλειο, lit. 'Heraklion'), also known as Iraklio on signage, is an Athens metro station in the municipality of Irakleio in the regional unit of North Athens, Attica, Greece. It is marked at the 19.246 km from the starting point in Piraeus station of Line 1. Initially, the station served the Athens–Lavrion Railway and Lavrion Square-Strofyli railway, ran by the Attica Railways. From 1929 the Lavrion branch was operated by Piraeus, Athens and Peloponnese Railways. The station was closed in 1938 for Kifissia traffic but remained open for Lavrion trains until 1957/1962. At the same location, the present station of EIS was opened on 4 March 1957, using the same name. It was the northernmost terminus of EIS until Kifissia station was reopened on 10 August 1958. The station has two passenger platforms and a reversing siding.

Excerpt from the Wikipedia article Irakleio metro station (License: CC BY-SA 3.0, Authors, Images).

Irakleio metro station
Μαρίνου Αντύπα, Municipality of Iraklio Attikis

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Irakleio metro stationContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 38.0462 ° E 23.766 °
placeShow on map

Address

Μαρίνου Αντύπα
141 21 Municipality of Iraklio Attikis, Iraklio
Attica, Greece
mapOpen on Google Maps

Irakleio station
Irakleio station
Share experience

Nearby Places

Athens Olympic Aquatic Centre

The Athens Olympic Aquatic Centre is a complex at the Athens Olympic Sports Complex in Marousi, Athens, Greece, consisting of two outdoor pools and one indoor pool, that was built for the 1991 Mediterranean Games. It was refurbished and expanded for the 2004 Summer Olympics and the 2004 Summer Paralympics. The larger of the two outdoor pools, which seats 11,500 spectators, hosted swimming and water polo events. The smaller pool, which hosted synchronized swimming, had the capacity for 5.300 people. The indoor pool also hosted the water polo finals and diving and the swimming during the Paralympics had capacity for another 6.300 persons. The outdoor pool was the subject of significant controversy during the run-up to the Olympic Games. At the bidding process, the Bidding Committee and the Greek Government promised that the outdoor pools would gain cover to meet the necessary conditions requested by FINA at the time. But, due to the inflation of the Game's works and the constant delays, it was decided that the planned coverage would have to wait for later, which until 2023 has not happened. According to preliminary assessments, the roof would serve to protect both athletes and spectators from the scorching sun and summer heat of Athens, which were even worse in the pools because of their location in the west. However, this ended up not happening because of inflated costs and constant delays in other works that were more urgent and there is no option, FINA approved the holding of events in outdoor pools that received temporary bleachers to reach the minimum required capacity these bleachers were higher than the fixed ones and provided shade for the outdoor pools and other areas of the complex, but not for the present public. Since 2005, outdoor pools have been used to host swimming programs during the period between the late spring to the early winter. During the high winter period, the programs were held in the indoor pools.In 2023, the two outdoor pools remain wide open to the sky.The location of the Olympic games was well thought out and needed a great place to be for Athens. The city of Athens wanted to use this opportunity to help improve the living and the quality of urban space. The hosting of these Olympic games and the urban regeneration hoped to be the start of a newer and better urban living. Unfortunately, after the games, the city did not have any set plans to do so. The last master plan dated back to 1985, and the next one was adopted in 2014, so they did not get the most out of the opportunity. It is known that the dynamics of urban cities have been strongly influenced by late 20th-century economic globalization. Hosting the 2004 Olympics at this aquatic center has helped Athens's economic growth and helped enhance the globalization of the urban areas. The aquatic center got many upgrades as well, which they made to ensure that the looks were up to date with global standards. Athens Olympic Aquatic Centre for the 2004 Olympics had a contract with the company PICO to supply the overlays to every Olympic center that was hosting the Olympic games. The Aquatic Centre needed many service overlays, tents, and stations to host all of the behind-the-scenes portions of the 2004 Olympics. This insured that the cameramen had the perfect locations to film, the security had tents and barricades set up so people could not sneak in, and insured the looks of the aquatic center were looking the best. They supplied nearly 1000 flag and banner poles, hanging up a variety of countries' flags and more.