The London Beer Flood was an accident at Meux & Co's Horse Shoe Brewery, London, on 17 October 1814. It took place when one of the 22-foot-tall (6.7 m) wooden vats of fermenting porter burst. The escaping liquid dislodged the valve of another vessel and destroyed several large barrels: between 128,000 and 323,000 imperial gallons (580,000–1,470,000 L; 154,000–388,000 US gal) of beer were released in total. The resulting wave of porter destroyed the back wall of the brewery and swept into an area of slum dwellings known as the St Giles rookery. Eight people were killed, five of them mourners at the wake being held by an Irish family for a two-year-old boy. The coroner's inquest returned a verdict that the eight had lost their lives "casually, accidentally and by misfortune". The brewery was nearly bankrupted by the event; it avoided collapse after a rebate from HM Excise on the lost beer. The brewing industry gradually stopped using large wooden vats after the accident. The brewery moved in 1921, and the Dominion Theatre is now where the brewery used to stand. Meux & Co went into liquidation in 1961.

Excerpt from the Wikipedia article London Beer Flood (License: CC BY-SA 3.0, Authors, Images).

London Beer Flood
Tottenham Court Road, London Bloomsbury (London Borough of Camden)

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: London Beer FloodContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 51.516944444444 ° E -0.13 °
placeShow on map

Address

Tottenham Court Road 267
W1T 7RQ London, Bloomsbury (London Borough of Camden)
England, United Kingdom
mapOpen on Google Maps

Horseshoe Brewery, London, c. 1800
Horseshoe Brewery, London, c. 1800
Share experience

Nearby Places

Tottenham Court Road chiller

In the 1930s, London Transport Board installed an experimental refrigeration plant on the London Underground at Tottenham Court Road Underground station. The plant was operational between 1938 and 1949. The experimental plant was built because temperature measurements through the 1930s showed that the Underground was steadily getting warmer. Although the temperatures were not at unsafe levels (peaks of 82 °F / 27.8 °C occurred at a few stations in summertime), the LTB perceived that if the trend continued, cooling in summer would be required at some time in the future, and it would be sensible to develop suitable technology. The chiller used water as the working fluid. The evaporators consisted of indirect heat exchangers mounted in the platform tunnels which were fed water at just above 0 °C. The condenser was sited in the outflow air path of an existing tunnel cooling fan, which had been installed in a disused lift shaft at the station in 1933. The outgoing air going through the condenser was warmed by 2–3 °C, before being discharged to atmosphere. Two descriptions of the cooling capacity exist. The first (from 1939) gives the capacity as "about half a million British thermal units per hour." The second (1982) states that it was "equivalent to melting approximately 51 tonnes of ice per day." In SI units, these are 146 kW and 197 kW respectively. The experimental plant was not considered a success, mainly because the cooling it provided was at high cost. An extractor fan of the same cooling capacity ('cooling capacity' in the sense that a fan removes warm air in the tunnels and replaces it with cooler air from outside) used up one-eighth of the electricity of the experimental refrigeration plant. Not only that, such a fan was easier to maintain and cost less to install. In the austere post-war years, the electrical power drawn by the chiller could not be justified. It was used intermittently during the 1940s, and was decommissioned in 1949.