place

3344 Peachtree

Atlanta stubsGeorgia (U.S. state) building and structure stubsMixed-use development condominiumsResidential condominiums in the United StatesResidential skyscrapers in Atlanta
Skyscraper office buildings in Atlanta
Sovereign Atlanta Building
Sovereign Atlanta Building

3344 Peachtree is a 50-story high-rise building of 635 feet (194 m) height located in Atlanta's uptown business district of Buckhead on Peachtree Road, the northern extension of Peachtree Street. The building is a mixed-use tower that incorporates upscale dining, office space, and 82 condominia at 3344 Peachtree Road. Completed in the spring of 2008, it is the ninth tallest building in Atlanta and the tallest mixed-use building in Atlanta. It has also surpassed the Park Avenue Condominiums as the tallest building in Atlanta not to be located downtown or midtown. The building is owned by Cousins Properties of Atlanta, Georgia.

Excerpt from the Wikipedia article 3344 Peachtree (License: CC BY-SA 3.0, Authors, Images).

3344 Peachtree
Peachtree Road Northeast, Atlanta Buckhead

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: 3344 PeachtreeContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 33.8471 ° E -84.3686 °
placeShow on map

Address

3344 Peachtree

Peachtree Road Northeast 3344
30326 Atlanta, Buckhead
Georgia, United States
mapOpen on Google Maps

Sovereign Atlanta Building
Sovereign Atlanta Building
Share experience

Nearby Places

North American Electric Reliability Corporation
North American Electric Reliability Corporation

The North American Electric Reliability Corporation (NERC) is a nonprofit corporation based in Atlanta, Georgia, and formed on March 28, 2006, as the successor to the North American Electric Reliability Council (also known as NERC). The original NERC was formed on June 1, 1968, by the electric utility industry to promote the reliability and adequacy of bulk power transmission in the electric utility systems of North America. NERC's mission states that it is to "ensure the reliability of the North American bulk power system."NERC oversees six regional reliability entities and encompasses all of the interconnected power systems of Canada and the contiguous United States, as well as a portion of the Mexican state of Baja California. NERC's major responsibilities include working with all stakeholders to develop standards for power system operation, monitoring and enforcing compliance with those standards, assessing resource adequacy, and providing educational and training resources as part of an accreditation program to ensure power system operators remain qualified and proficient. NERC also investigates and analyzes the causes of significant power system disturbances in order to help prevent future events. NERC's standards for generating resources require that sufficient generating capacity be provided such that customers will need to be disconnected less often than once every ten years. These standards are mandatory for only some of the regional entities.