place

Terminus (office complex)

Neighborhoods in AtlantaResidential skyscrapers in AtlantaSkyscraper office buildings in Atlanta
Terminus complex Atlanta
Terminus complex Atlanta

Terminus is a business and residential complex located in Buckhead, Atlanta, Georgia. The office component of the district is made up of Terminus 200 and Terminus 100. Terminus 100, at the corner of Peachtree Road and Piedmont Road, is the tallest building in Terminus at 485 ft (148 m) tall, and is the 18th-tallest building in Atlanta. Terminus 200 was completed in 2009 and has 22 floors. 10 Terminus Place, the residential component of the complex, is a condominium tower with 32 floors. The name "Terminus" derives from Atlanta's original name, derived from the city's founding as the southeastern terminus for the Western & Atlantic Railroad, although the city was never officially named this.

Excerpt from the Wikipedia article Terminus (office complex) (License: CC BY-SA 3.0, Authors, Images).

Terminus (office complex)
Piedmont Road Northeast, Atlanta Buckhead

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Terminus (office complex)Continue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 33.8441 ° E -84.3715 °
placeShow on map

Address

Piedmont Road Northeast 3300
30305 Atlanta, Buckhead
Georgia, United States
mapOpen on Google Maps

Terminus complex Atlanta
Terminus complex Atlanta
Share experience

Nearby Places

North American Electric Reliability Corporation
North American Electric Reliability Corporation

The North American Electric Reliability Corporation (NERC) is a nonprofit corporation based in Atlanta, Georgia, and formed on March 28, 2006, as the successor to the North American Electric Reliability Council (also known as NERC). The original NERC was formed on June 1, 1968, by the electric utility industry to promote the reliability and adequacy of bulk power transmission in the electric utility systems of North America. NERC's mission states that it is to "ensure the reliability of the North American bulk power system."NERC oversees six regional reliability entities and encompasses all of the interconnected power systems of Canada and the contiguous United States, as well as a portion of the Mexican state of Baja California. NERC's major responsibilities include working with all stakeholders to develop standards for power system operation, monitoring and enforcing compliance with those standards, assessing resource adequacy, and providing educational and training resources as part of an accreditation program to ensure power system operators remain qualified and proficient. NERC also investigates and analyzes the causes of significant power system disturbances in order to help prevent future events. NERC's standards for generating resources require that sufficient generating capacity be provided such that customers will need to be disconnected less often than once every ten years. These standards are mandatory for only some of the regional entities.