place

Cheetham Town Hall

City and town halls in Greater ManchesterGovernment buildings completed in 1855Grade II listed buildings in ManchesterUse British English from October 2023
Former town hall, Cheetham Hill Road, Manchester (geograph 7567247)
Former town hall, Cheetham Hill Road, Manchester (geograph 7567247)

Cheetham Town Hall is a former municipal building in Cheetham Hill Road, Cheetham, Manchester, England. The structure, which now operates as a restaurant, is a Grade II listed building.

Excerpt from the Wikipedia article Cheetham Town Hall (License: CC BY-SA 3.0, Authors, Images).

Cheetham Town Hall
Cheetham Hill Road, Manchester Strangeways

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Cheetham Town HallContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 53.4937 ° E -2.24 °
placeShow on map

Address

Milan

Cheetham Hill Road 107
M8 8PY Manchester, Strangeways
England, United Kingdom
mapOpen on Google Maps

Former town hall, Cheetham Hill Road, Manchester (geograph 7567247)
Former town hall, Cheetham Hill Road, Manchester (geograph 7567247)
Share experience

Nearby Places

One Angel Square
One Angel Square

One Angel Square is a high-rise office building in Manchester, England. Construction work began in 2010 and was completed in February 2013. The landmark building is the head office of the Co-operative Group. Standing 72.5 metres (238 ft) tall, the building forms the centrepiece of the £800 million NOMA development in the Angel Meadows area of Manchester city centre. The building cost at least £105 million to construct and was sold on leaseback terms in 2013 for £142 million. One Angel Square is one of the most sustainable large buildings in Europe and is built to a BREEAM 'Outstanding' rating. It is powered by a biodiesel cogeneration plant using rapeseed oil to provide electricity and heat. The structure makes use of natural resources, maximising passive solar gain for heat and using natural ventilation through its double-skin façade, adiabatic cooling, rainwater harvesting, greywater recycling and waste heat recycling.The building's distinctive form has been compared to a sliced egg and a ship. Its design was announced by architects 3DReid in May 2009 and construction began in July 2010, with a projected completion date in March 2013. In December 2012, the scheme surpassed its pan-European sustainability aims and achieved a world-record BREEAM score of 95.32%. It is also an energy-plus building, producing surplus energy and zero carbon emissions. The building has received numerous awards for its striking aesthetic and sustainability aims.