place

Gadsden Green Homes

Public housing in Charleston, South Carolina

Gadsden Green Homes is a housing complex located in the Westside neighborhood in Charleston, South Carolina. The name comes from the neighborhood which had been owned by Christopher Gadsden. The housing project was built in two stages: the eastern half (bounded by Line St. to the north, President St. to the east, Bogard and Allway Sts. to the south, and Flood St. to the west) was constructed in 1942 while the western half (bounded by Line St. to the north, Flood St. to the east, Allway St. to the south, and Hagood Ave. to the west) was finished in 1968.

Excerpt from the Wikipedia article Gadsden Green Homes (License: CC BY-SA 3.0, Authors).

Gadsden Green Homes
Flood Street, Charleston

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Gadsden Green HomesContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 32.789839222222 ° E -79.953723 °
placeShow on map

Address

Flood Street

Flood Street
29425 Charleston
South Carolina, United States
mapOpen on Google Maps

Share experience

Nearby Places

Charleston Arsenal
Charleston Arsenal

The Charleston Arsenal was a United States Army arsenal facility in Charleston, South Carolina, seized by state militia at the outbreak of the American Civil War.The arsenal was constructed between 1825 and 1832 by the United States government near the intersection of Ashley Avenue and Mill Street in Charleston. It served as a storage place for weapons, ordnance, and ammunition for the U.S. Army in antebellum days. (An earlier Federal arsenal, the Old Citadel, was taken out of service and after became a part of The Citadel.) The Charleston arsenal produced a considerable amount of artillery and small arms ammunition during the Mexican–American War and up to the Civil War. With the secession of South Carolina in December 1860, the Arsenal became a target for Charleston militia. South Carolina troops seized the arsenal in late December, and the Confederates held it for much of the war. Josiah Gorgas had the arsenal enlarged and modernized with the installation of steam power. For a time, it was used a barracks to house Confederate troops, including the 26th South Carolina. The arsenal was retaken by Union troops in 1865 when Charleston finally fell. On July 16, 1866, the U.S. government designated the 11.26-acre (4.56 ha) site as a Federal Military Reservation, but in 1879 the Army closed the arsenal. The building and land were sold in 1888, to the Porter Military Academy which occupied the site until it built a new campus west of the Ashley River, and in 1963 the site became part of the Medical University of South Carolina.

MUSC Health University Medical Center

MUSC Health University Medical Center is a university hospital associated with the Medical University of South Carolina, based in Charleston, South Carolina with additional sites located throughout the state. In 1946, the South Carolina General Assembly passed a $4 million bill to construct a new teaching hospital that was brought under the control of the Medical College of South Carolina. Construction began in 1951 and the Medical College of South Carolina Hospital was completed and dedicated on May 10, 1955 with its doors opening on September 26, 1955, to its first patients. It was later renamed to the Medical University of South Carolina Hospital (MUSC) and is now MUSC Health University Medical Center. The MUSC Health Transplant Center is one of the top ten kidney transplantation centers in the nation. The MUSC Health Transplant Center is supported by the only HLA Laboratory in South Carolina. MUSC Health University Medical Center is the regional referral center for the Lowcountry of South Carolina. Plans were announced in 2017 for a new 126,000-square-foot outpatient facility to be constructed in the former JCPenney building at Citadel Mall in West Ashley. The two-story complex will be completely renovated with the lower level used for surgery and procedures, radiology and therapy; a second floor will hold physician offices and examination rooms.The Phase I Replacement Hospital with 156 beds was completed in 2008 and a new Bee Street Parking Garage opened for employee and rehab patient parking. The Pediatric Trauma Center/Emergency Room was re-built, opening in first quarter 2009. The long-term plan includes 4 more phases of construction which will provide an updated trauma center, adult rooms and expanded Children's Hospital.