place

Southfront Road station

Alameda County, California building and structure stubsFuture Valley Link stationsLivermore, CaliforniaRailway stations scheduled to open in 2028San Francisco Bay Area railway station stubs
Use mdy dates from November 2022

Southfront Road is a planned railway station in Livermore, California. It is a stop on the planned Valley Link system. Rush hour short turn Valley Link trains would operate from here to Dublin/Pleasanton. Service is expected to start as early as 2028.

Excerpt from the Wikipedia article Southfront Road station (License: CC BY-SA 3.0, Authors).

Southfront Road station
Arthur H. Breed Junior Freeway, Livermore

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Southfront Road stationContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 37.70514 ° E -121.73297 °
placeShow on map

Address

Arthur H. Breed Junior Freeway

Arthur H. Breed Junior Freeway
94550 Livermore
California, United States
mapOpen on Google Maps

Share experience

Nearby Places

National Ignition Facility
National Ignition Facility

The National Ignition Facility (NIF) is a laser-based inertial confinement fusion (ICF) research device, located at Lawrence Livermore National Laboratory in Livermore, California, United States. NIF's mission is to achieve fusion ignition with high energy gain. It achieved the first instance of scientific breakeven controlled fusion in an experiment on December 5, 2022, with an energy gain factor of 1.5. It supports nuclear weapon maintenance and design by studying the behavior of matter under the conditions found within nuclear explosions.NIF is the largest and most powerful ICF device built to date. The basic ICF concept is to squeeze a small amount of fuel to reach pressure and temperature necessary for fusion. NIF hosts the world's most energetic laser. The laser heats the outer layer of a small sphere. The energy is so intense that it causes the sphere to implode, squeezing the fuel inside. The implosion reaches a peak speed of 350 km/s (0.35 mm/ns), raising the fuel density from about that of water to about 100 times that of lead. The delivery of energy and the adiabatic process during implosion raises the temperature of the fuel to hundreds of millions of degrees. At these temperatures, fusion processes occur in the tiny interval before the fuel explodes outward. Construction on the NIF began in 1997. NIF was completed five years behind schedule and cost almost four times its original budget. Construction was certified complete on March 31, 2009, by the U.S. Department of Energy. The first large-scale experiments were performed in June 2009 and the first "integrated ignition experiments" (which tested the laser's power) were declared completed in October 2010.From 2009 to 2012 experiments were conducted under the National Ignition Campaign, with the goal of reaching ignition just after the laser reached full power, some time in the second half of 2012. The campaign officially ended in September 2012, at about 1⁄10 the conditions needed for ignition. Thereafter NIF has been used primarily for materials science and weapons research. In 2021, after improvements in fuel target design, NIF produced 70% of the energy of the laser, beating the record set in 1997 by the JET reactor at 67% and achieving a burning plasma. On December 5, 2022, after further technical improvements, NIF reached "ignition", or scientific breakeven, for the first time, achieving a 154% energy yield.