The Portage Bridge (French: Pont du Portage) crosses the Ottawa River just down-river from the Chaudière Bridge, joining the communities of Gatineau, Quebec and Ottawa, Ontario. It links Laurier Street and Alexandre-Taché Boulevard in the Hull sector of Gatineau and Wellington Street at the Garden of the Provinces and Territories in Ottawa, crossing Victoria Island and the former Philemon Island on the way. The bridge was built by the National Capital Commission in 1973 and expanded in 1988. The bridge is named after the historic Portage Trail around the Chaudière Falls and Rapids which ended near the present location of the bridge.

Excerpt from the Wikipedia article Portage Bridge (License: CC BY-SA 3.0, Authors, Images).

Portage Bridge
Portage Bridge cycle track, (Old) Ottawa Somerset

Geographical coordinates (GPS) Address External links Nearby Places
placeShow on map

Wikipedia: Portage BridgeContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 45.422222222222 ° E -75.713611111111 °
placeShow on map

Address

Pont du Portage

Portage Bridge cycle track
K1A 0M8 (Old) Ottawa, Somerset
Ontario, Canada
mapOpen on Google Maps

linkWikiData (Q3397495)
linkOpenStreetMap (576886086)

Portage Bridge Ottawa Hull
Portage Bridge Ottawa Hull
Share experience

Nearby Places

Place du Portage
Place du Portage

Place du Portage is a large office complex in the Hull sector of Gatineau, Quebec, Canada, situated along Boulevard Maisonneuve and facing the Ottawa River. It is owned and occupied by the Federal Government of Canada. Place du Portage consists of four phases which were built in different stages during the 1970s and early 80s. The office complex was built in order to revitalize Hull's decaying downtown core and also to increase the proportion of the federal workforce in the overall National Capital Region. Although the installation of thousands of jobs in the Hull and Gatineau area has resulted in significant economic benefits to local businesses and the real estate market, some people feel that the complex has transformed downtown Hull in some negative ways. Much of the old downtown core was replaced with a series of massive towers and approximately 4,000 residents and businesses were displaced in the area that was once the town's main commercial area.The whole complex (Place du Portage I, II, III, IV and Place d'Accueil) accommodates approximately 10,000 office workers. That makes Place du Portage the biggest office complex in the National Capital Region. Pedestrian bridges to city hall, which in turn has a pedestrian bridge to a hotel, makes this the center of a mini-"underground city". Connected to and situated between Phase II and III is Place du Centre, a retail and office complex with a 28,600 m2 (308,000 sq ft) shopping mall on the lower floors and nine floors of office space, for a total area of 43,000 square metres (460,000 sq ft). Although it houses the Federal Government's Foreign Affairs, Trade and Development Canada (DFATD) on floors 4 through 12, it is commercially owned and operated, and not part of Place du Portage.

LGBTQ2+ National Monument

The LGBTQ2+ National Monument, or 2SLGBTQI+ National Monument, is a planned public monument in Ottawa, Ontario, Canada, dedicated to the history of lesbian, gay, bisexual, transgender, queer and two-spirit communities in Canada. The monument was launched by the LGBT Purge Fund, an organization created from the 2018 settlement of the class action suit against the Government of Canada by victims of the purges of LGBTQ employees from the federal civil service in the 1960s. In 2020 the fund and the National Capital Commission announced the planned site, a parkland site on Wellington Street between Library and Archives Canada and the Portage Bridge, and launched a design competition for artists and architects to submit proposals. In November 2021, the five shortlisted designs were unveiled. They included The Lens, by Fathom Studio, Two Row Architect and MVRDV; A Glass Bowl, by MASS Design Group and Stephen Andrews; Bapiiwin, by SOM, HTFC, Rebecca Belmore, Noam Gonick, Lyle Dick and Iraklis Lampropoulos; Thunderhead, by Public City, Shawna Dempsey and Lorri Millan and Albert McLeod; and OnCommonGround by bbb architects Ottawa, PWP Landscape Architects, WSP Engineering, Nadia Myre, Udo Schliemann, Robert Lepage, Nicole Crevier and Trudi Fontaine. In March 2022, the Thunderhead design was announced as the final winner by LGBT Purge Fund director Michelle Douglas. It will feature a mirrored thunderhead cloud inside a large column surrounded by an orchard, a medicinal garden, a healing circle with stones selected by indigenous elders and a walking path, and is intended to serve both as a space for quiet reflection on LGBTQ history in Canada and a venue for artistic performances and protests. The monument is slated to open in 2025.

National Holocaust Monument
National Holocaust Monument

The National Holocaust Monument (French: Monument national de l'Holocauste) is a Holocaust memorial in Ottawa, Ontario, across from the Canadian War Museum at the northeast corner of Wellington and Booth Streets, and about 1.5 km away from Parliament Hill. The memorial has been designed by Daniel Libeskind.The National Holocaust Monument Act (Bill C-442), which established plans to create the memorial in Canada's capital, received Royal Assent on March 25, 2011. The law was introduced as a private members bill by Tim Uppal, Minister of State and MP for Edmonton—Sherwood Park and received unanimous support.The monument features a view of the Peace Tower and photographs by Edward Burtynsky. The team was led by Lord Cultural Resources.The monument is overseen by the National Capital Commission. The monument was planned to be unveiled in the fall of 2015, but later pushed back to the spring of 2017 due to delays in construction. The official unveiling occurred on September 27, 2017. In 2017, when the National Holocaust Monument of Canada was unveiled in Ottawa, the opening plaque made no mention of the six million Jews killed by the Nazis. Subsequently, chair Rabbi Daniel Friedman took responsibility for the error.The monument was built due to the persistent activism of former University of Ottawa student, Laura Grosman. Laura began advocating for a monument to be built commemorating the Nazis atrocities and as a beacon of light for Canadian Holocaust survivors. She campaigned and met with various Members of Parliament to support the introduction of a Private Members Bill. She is the granddaughter of a Polish-born Holocaust survivor.

Memorial to the Victims of Communism – Canada, a Land of Refuge

The Memorial to the Victims of Communism – Canada, a Land of Refuge is a controversial monument that as of July 2021 is currently under construction in Ottawa, Ontario, Canada. It was originally to be erected on a site between the Supreme Court of Canada and the National Library of Canada but in December 2015, Canadian Heritage Minister Mélanie Joly suggested that the National Capital Commission instead approve a 500 square metre site half a kilometre to the west, in the Garden of the Provinces and Territories. Under the revised timeline, a national competition was held in 2016 and 2017 to select a new design for the monument. The site was dedicated in a ceremony held on November 2, 2017. Construction began in early November 2019, and was expected to be completed by the summer of 2020, but by the end of 2022 was still not finished, with no construction progress made in 2022. Joly complained that the previous Harper government had made the project too controversial. The new Liberal government has moved the site and cut its budget. She stated: Commemorative monuments play a key role in reflecting the character, identity, history and values of Canadians. They should be places of reflection, inspiration and learning, not shrouded in controversy." The winning design was announced in May 2017 as Arc of Memory designed by Toronto architect Paul Raff in partnership with designer and arborist Michael A. Ormston-Holloway, and landscape architects Brett Hoornaert and Luke Kairys, and was described by the selection committee as follows: The Arc of Memory features two gently curving wall-like metal frames totalling 21 metres in length and almost 4 metres in height. The walls support more than 4000 short bronze rods densely arranged along 365 steel fins, each one pointing at a unique angle of the sun, for every hour of every day, across a year. The memorial would be split in the middle at winter solstice, the darkest day of the year, inviting visitors to step through in a metaphorical journey from darkness and oppression to lightness and liberty.