place

St John's College, Hamilton

1923 establishments in New ZealandBoys' schools in New ZealandCatholic secondary schools in Hamilton, New ZealandEducational institutions established in 1923Marist Brothers schools
Secondary schools in Hamilton, New ZealandUse New Zealand English from July 2019

St John's College is a state-integrated Catholic boys' secondary school in Hamilton, New Zealand, with a school roll of 916 as of April 2023. The school was established by the Marist Brothers in 1961 from Marist School (now Marian Catholic School). The school crest features the eagle of St. John the Apostle, with the motto "Caritas Christi Urget Nos" strewn across the bottom, a Latin motto translating loosely into "Christ's love urges us on". The mission statement for the school is "Preparing Young Men For Life".

Excerpt from the Wikipedia article St John's College, Hamilton (License: CC BY-SA 3.0, Authors).

St John's College, Hamilton
Hillcrest Road, Hamilton Hillcrest

Geographical coordinates (GPS) Address Phone number Website External links Nearby Places
placeShow on map

Wikipedia: St John's College, HamiltonContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N -37.791 ° E 175.3169 °
placeShow on map

Address

Saint John's College

Hillcrest Road 85
3216 Hamilton, Hillcrest
Waikato, New Zealand
mapOpen on Google Maps

Phone number

call+6478567091

Website
stjohns-hamilton.school.nz

linkVisit website

linkWikiData (Q7593575)
linkOpenStreetMap (66212196)

Share experience

Nearby Places

Peacocke Bridge
Peacocke Bridge

Peacocke Bridge is a girder bridge under construction over the Waikato River in Hamilton, New Zealand. The bridge on Wairere Drive is part of the Southern Links, which will complete a ring road around Hamilton. It will link Hamilton East with a new suburb of Peacocke. Construction started in 2020, though the plan originated in 1962.The bridge is formed with 2,650 tonnes of steel and is expected to be completed by mid 2024, at a cost of $160.2M, though budgeted at $135M in 2020, estimated at no more than $60M in 2017 and formerly at $40M. The bridge was delayed by COVID-19 and Cyclone Gabrielle and other storms. The four-lane bridge was designed by Bloxam Burnett & Olliver, and is being built by HEB Construction. It will include bus lanes and cycle paths, and will also carry the Peacocke to Pukete sewer line. The river was closed to boats during construction.Both banks of the river have been stabilised to support the bridge. The north bank, next to the bridge abutments, has a 50-degree slope, rising 45 metres (148 ft), or 35 metres (115 ft), and was stabilised with 150-millimetre (5.9 in) soil nails. The total length of the bridge is 215 metres (705 ft), including the 11-metre-high (36 ft) mechanically stabilised earth wall of the southern bridge abutment, which is on compressible, loose Taupō Pumice alluvial soils, of the river terraces. The bridge itself is 180 metres (590 ft) long (made up of a 70-metre (230 ft) northern span, 50-metre (160 ft) central span and a 60-metre (200 ft) southern span), 26.2 metres (86 ft) wide, on 38-metre-deep (125 ft), closely spaced, bridge piles, with 35-metre-long (115 ft) earth anchors and over 600 eight-metre-long (26 ft) soil nails. The bridge is over 30 metres (98 ft) above the normal river level. The main support is a pier on the south bank of the river, formed of weathering steel, in two lattice-shaped, 30-by-22-metre (98 ft × 72 ft) Y sections, each weighing over 200 tonnes. The lattice is made up of 2.2-by-0.82-metre (7.2 ft × 2.7 ft) box-section welded plates. They were lifted into position by a 600-tonne crane.