place

University of Waikato

1964 establishments in New ZealandEducational institutions established in 1964EngvarB from April 2018Pages with non-numeric formatnum argumentsPublic universities
Universities in New ZealandUniversity of Waikato

The University of Waikato (Māori: Te Whare Wānanga o Waikato), established in 1964, is a public research university located in Hamilton, New Zealand. An additional campus is located in Tauranga. The university performs research in numerous disciplines such as education, social sciences, and management and is an innovator in environmental science, marine and freshwater ecology, engineering and computer science. It offers degrees in health, engineering, computer science, management, Māori and Indigenous Studies, the arts, psychology, social sciences and education.

Excerpt from the Wikipedia article University of Waikato (License: CC BY-SA 3.0, Authors).

University of Waikato
May Street, Hamilton Ruakura

Geographical coordinates (GPS) Address Website External links Nearby Places
placeShow on map

Wikipedia: University of WaikatoContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N -37.786944444444 ° E 175.31388888889 °
placeShow on map

Address

University of Waikato (Waikato University)

May Street
3216 Hamilton, Ruakura
Waikato, New Zealand
mapOpen on Google Maps

Website
waikato.ac.nz

linkVisit website

linkWikiData (Q606140)
linkOpenStreetMap (37308626)

Share experience

Nearby Places

Peacocke Bridge
Peacocke Bridge

Peacocke Bridge is a girder bridge under construction over the Waikato River in Hamilton, New Zealand. The bridge on Wairere Drive is part of the Southern Links, which will complete a ring road around Hamilton. It will link Hamilton East with a new suburb of Peacocke. Construction started in 2020, though the plan originated in 1962.The bridge is formed with 2,650 tonnes of steel and is expected to be completed by mid 2024, at a cost of $160.2M, though budgeted at $135M in 2020, estimated at no more than $60M in 2017 and formerly at $40M. The bridge was delayed by COVID-19 and Cyclone Gabrielle and other storms. The four-lane bridge was designed by Bloxam Burnett & Olliver, and is being built by HEB Construction. It will include bus lanes and cycle paths, and will also carry the Peacocke to Pukete sewer line. The river was closed to boats during construction.Both banks of the river have been stabilised to support the bridge. The north bank, next to the bridge abutments, has a 50-degree slope, rising 45 metres (148 ft), or 35 metres (115 ft), and was stabilised with 150-millimetre (5.9 in) soil nails. The total length of the bridge is 215 metres (705 ft), including the 11-metre-high (36 ft) mechanically stabilised earth wall of the southern bridge abutment, which is on compressible, loose Taupō Pumice alluvial soils, of the river terraces. The bridge itself is 180 metres (590 ft) long (made up of a 70-metre (230 ft) northern span, 50-metre (160 ft) central span and a 60-metre (200 ft) southern span), 26.2 metres (86 ft) wide, on 38-metre-deep (125 ft), closely spaced, bridge piles, with 35-metre-long (115 ft) earth anchors and over 600 eight-metre-long (26 ft) soil nails. The bridge is over 30 metres (98 ft) above the normal river level. The main support is a pier on the south bank of the river, formed of weathering steel, in two lattice-shaped, 30-by-22-metre (98 ft × 72 ft) Y sections, each weighing over 200 tonnes. The lattice is made up of 2.2-by-0.82-metre (7.2 ft × 2.7 ft) box-section welded plates. They were lifted into position by a 600-tonne crane.