Remington Centre
Remington Centre (Chinese: 滙通廣場) is an upcoming 800,000-square-foot (74,000 m2) Chinese-themed mall to be built at the corner of Kennedy Road and Steeles Avenue in Markham, Ontario, Canada, on the site of the former Market Village mall which closed on March 1, 2018. It will be connected to Pacific Mall by an indoor walkway. Market Village was scheduled for demolition and construction of the new mall which should have begun in the third quarter of 2013, but demolition began in October 2018. The new mall will have a contemporary design and unique features, including light-filled hallways, indoor and outdoor public spaces and signature night market.In 2009, plans were developed to demolish Market Village and replace it with a larger and modern complex called the Remington Centre. It will feature a two level structure with over 800,000 square feet (74,000 m2) of retail and commercial space and two condo towers (billed at The Grand Residences at Remington Centre) located on the southeast end. The Remington Centre will aim for LEED status along with the installation of 1100 tonnes of geothermal capacity. It is currently unknown when the mall will be constructed and completed due to several delays.
Excerpt from the Wikipedia article Remington Centre (License: CC BY-SA 3.0, Authors, Images).Remington Centre
Steeles Avenue East, Markham
Geographical coordinates (GPS) Address Nearby Places Show on map
Continue reading on Wikipedia
Geographical coordinates (GPS)
Latitude | Longitude |
---|---|
N 43.8255 ° | E -79.3035 ° |
Address
Steeles Avenue East
M1V 4S5 Markham
Ontario, Canada
Open on Google Maps