place

Niantic River Bridge

Bascule bridges in the United StatesBridges completed in 1907Bridges in New London County, ConnecticutGirder bridges in the United StatesHistoric American Engineering Record in Connecticut
King Bridge CompanyNew York, New Haven and Hartford Railroad bridgesRailroad bridges in Connecticut
Niantic River Bridge, June 2013
Niantic River Bridge, June 2013

Niantic River Bridge, also known as Amtrak Bascule Bridge No. 116.74, is a railroad bridge carrying Amtrak's Northeast Corridor line across the Niantic River between East Lyme and Waterford, Connecticut. It is a drawbridge with a bascule-type draw span. A new bridge was constructed in 2012 to replace the former span built in 1907. It opened on September 8, 2012. Related construction work finished in June 2013.

Excerpt from the Wikipedia article Niantic River Bridge (License: CC BY-SA 3.0, Authors, Images).

Niantic River Bridge
Niantic Boardwalk,

Geographical coordinates (GPS) Address External links Nearby Places
placeShow on map

Wikipedia: Niantic River BridgeContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 41.3227 ° E -72.1769 °
placeShow on map

Address

Niantic River Bridge

Niantic Boardwalk
06357
Connecticut, United States
mapOpen on Google Maps

linkWikiData (Q7024079)
linkOpenStreetMap (706776501)

Niantic River Bridge, June 2013
Niantic River Bridge, June 2013
Share experience

Nearby Places

Millstone Nuclear Power Plant
Millstone Nuclear Power Plant

The Millstone Nuclear Power Station is the only nuclear power plant in Connecticut and the only multi-unit nuclear plant in New England. It is located at a former quarry (from which it takes its name) in Waterford. With a total capacity of over 2 GW, the station produces enough electricity to power about 2 million homes. The operation of the Millstone Power Station supports more than 3,900 jobs, and generates the equivalent of over half the electricity consumed in Connecticut.The Millstone site covers about 500 acres (2 km²). The power generation complex was built by a consortium of utilities, using Long Island Sound as a source of secondary side cooling. Millstone Units 2 and 3, both pressurized water reactors (one from Westinghouse and one from Combustion Engineering), were sold to Dominion Resources by Northeast Utilities in 2000 and continue to operate.The plant has had numerous safety-related shutdowns and at times been placed on enhanced examination status by the Nuclear Regulatory Commission. In 1999, Northeast Utilities, the plant's operator at the time, agreed to pay $10 million in fines for 25 counts of lying to federal investigators and for having falsified environmental reports. Its subsidiary, Northeast Nuclear Energy Company, paid an additional $5 million for having made 19 false statements to federal regulators regarding the promotion of unqualified plant operators between 1992 and 1996.On November 28, 2005, after a 22-month application and evaluation process, Millstone was granted a 20-year license extension for both units 2 and 3 by the NRC.