place

Niantic, Connecticut

Census-designated places in ConnecticutCensus-designated places in New London County, ConnecticutConnecticut placenames of Native American originEast Lyme, ConnecticutPopulated coastal places in Connecticut
Use mdy dates from July 2023Villages in ConnecticutVillages in New London County, Connecticut
Morton house
Morton house

Niantic is a census-designated place (CDP) and village in the town of East Lyme, Connecticut in the United States. The population was 3,114 at the 2010 census. It is located on Long Island Sound, the Millstone Nuclear Power Plant in nearby Waterford is visible on the bay's eastern horizon line, Rocky Neck State Park is also located in the area. Niantic was once famous for its Niantic River scallops, but the scallop population has been in decline for a number of years.

Excerpt from the Wikipedia article Niantic, Connecticut (License: CC BY-SA 3.0, Authors, Images).

Niantic, Connecticut
Hope Street,

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Niantic, ConnecticutContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 41.325277777778 ° E -72.193055555556 °
placeShow on map

Address

Hope Street 12
06357
Connecticut, United States
mapOpen on Google Maps

Morton house
Morton house
Share experience

Nearby Places

Millstone Nuclear Power Plant
Millstone Nuclear Power Plant

The Millstone Nuclear Power Station is the only nuclear power plant in Connecticut and the only multi-unit nuclear plant in New England. It is located at a former quarry (from which it takes its name) in Waterford. With a total capacity of over 2 GW, the station produces enough electricity to power about 2 million homes. The operation of the Millstone Power Station supports more than 3,900 jobs, and generates the equivalent of over half the electricity consumed in Connecticut.The Millstone site covers about 500 acres (2 km²). The power generation complex was built by a consortium of utilities, using Long Island Sound as a source of secondary side cooling. Millstone Units 2 and 3, both pressurized water reactors (one from Westinghouse and one from Combustion Engineering), were sold to Dominion Resources by Northeast Utilities in 2000 and continue to operate.The plant has had numerous safety-related shutdowns and at times been placed on enhanced examination status by the Nuclear Regulatory Commission. In 1999, Northeast Utilities, the plant's operator at the time, agreed to pay $10 million in fines for 25 counts of lying to federal investigators and for having falsified environmental reports. Its subsidiary, Northeast Nuclear Energy Company, paid an additional $5 million for having made 19 false statements to federal regulators regarding the promotion of unqualified plant operators between 1992 and 1996.On November 28, 2005, after a 22-month application and evaluation process, Millstone was granted a 20-year license extension for both units 2 and 3 by the NRC.