place

Century Mill, Farnworth

FarnworthTextile mills in the Metropolitan Borough of BoltonTextile mills owned by the Lancashire Cotton Corporation

Century Mill, Farnworth is a former cotton spinning mill in Farnworth, Bolton, Greater Manchester, England which was built in the early 20th century for ring spinning. It was taken over by the Lancashire Cotton Corporation in the 1930s and passed to Courtaulds in 1964. The 6,674.00-square-metre (71,838.3 sq ft) building is still in use for various other purposes in 2016.

Excerpt from the Wikipedia article Century Mill, Farnworth (License: CC BY-SA 3.0, Authors).

Century Mill, Farnworth
George Street,

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Century Mill, FarnworthContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 53.5454 ° E -2.4112 °
placeShow on map

Address

George Street
BL4 9RN , New Bury
England, United Kingdom
mapOpen on Google Maps

Share experience

Nearby Places

Moses Gate railway station
Moses Gate railway station

Moses Gate railway station serves the Moses Gate suburb of Farnworth in the Metropolitan Borough of Bolton, Greater Manchester, North West England. It lies on the Manchester-Preston Line 1+1⁄4 miles (2.0 km) south of Bolton, though only local services run by Northern call here. Until the late 1970s, Moses Gate was one of the more important stations on the line between Manchester Victoria and Bolton, with Sunday service and high patronage. But due to clearance of much housing in the area, use has declined (see Strategic Rail Authority figures) although it retains an hourly service (see National Rail Timetable). Moses Gate is the nearest railway station to the village of Little Lever. The station was staffed until the early 1990s, but the station buildings were badly damaged in an arson attack and subsequently demolished. It is now unmanned and has no ticketing facilities (passengers intending to travel must buy tickets in advance or on the train). Shelters and timetable posters are located on both platforms; though there are ramps to each platform, the National Rail Enquiries entry for the station states that it is not currently (December 2016) DDA-compliant.From early May 2015 until the December 2015 timetable change, services from the station were suspended and replaced by buses due to the ongoing modernisation work here (where the platforms have been rebuilt, ahead of planned electrification of the line) and on the route further south at Farnworth Tunnel. The station reopened on 14 December 2015.