place

Braystones railway station

1849 establishments in EnglandDfT Category F2 stationsFormer Furness Railway stationsNorth West England railway station stubsNorthern franchise railway stations
Pages with no open date in Infobox stationRailway request stops in Great BritainRailway stations in CumbriaRailway stations in Great Britain opened in 1849Use British English from December 2016
Railway at Braystones (geograph 1680910)
Railway at Braystones (geograph 1680910)

Braystones is a railway station on the Cumbrian Coast line, which runs between Carlisle and Barrow-in-Furness. The station, situated 37 miles (60 km) north-west of Barrow-in-Furness, serves the villages of Beckermet and Braystones in Cumbria. It is owned by Network Rail and managed by Northern Trains. The station is an unstaffed request stop. It is situated directly on the coast in a remote location. Pearson's 1992 railway guide is moved to comment, "The tiny halts at Braystones and Nethertown are as remote as anything British Rail has to offer...".

Excerpt from the Wikipedia article Braystones railway station (License: CC BY-SA 3.0, Authors, Images).

Braystones railway station
Beck Close,

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Braystones railway stationContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 54.4394814 ° E -3.5419885 °
placeShow on map

Address

Braystones

Beck Close
CA21 2YJ , Lowside Quarter
England, United Kingdom
mapOpen on Google Maps

Railway at Braystones (geograph 1680910)
Railway at Braystones (geograph 1680910)
Share experience

Nearby Places

Moorside nuclear power station

Moorside nuclear power station is proposed for a site near Sellafield, in Cumbria, England. The original plan by NuGeneration, a British subsidiary of Toshiba-owned Westinghouse Electric Company, had the station coming online from 2024 with 3.4 GW of new nuclear capacity, from three AP1000 reactors. Work up to 2018 would include acquiring the site licence, the development consent order, and other required permits and permissions to start work. Site preparation was to take two years, up to 2020. Following the Chapter 11 bankruptcy of Westinghouse in March 2017, the project was put under review. From December 2017 to July 2018 Kepco was named as preferred bidder. Kepco were thought to prefer their own APR-1400 reactor design for the site, a design which had not yet gone through generic design assessment with the UK's Office for Nuclear Regulation. On 8 November 2018, it was announced that Toshiba's plans for the new nuclear power station had been scrapped and its subsidiary company, NuGen, would be wound up. The Moorside site was handed back to the Nuclear Decommissioning Authority, and the government issued a statement reaffirming its commitment to new nuclear. In July 2020, a EDF-led Moorside consortium announced a proposal for two EPR reactors yielding 3,200 MWe of new nuclear capacity. A second Rolls-Royce-led UK SMR consortium plans a low-carbon power station around a small light-water reactor and the possibility of a link with renewable technologies, storage systems and hydrogen production named Moorside clean energy hub.