Beckermet railway station

1857 establishments in EnglandDisused railway stations in CumbriaPages with no open date in Infobox stationRailway stations in Great Britain closed in 1947Railway stations in Great Britain opened in 1857
Use British English from January 2015
Beckermet Station 1775893 767431c5
Beckermet Station 1775893 767431c5

Beckermet railway station is a disused rail station located in the village of Beckermet in Cumbria. Tracks were laid southwards from Whitehaven and Moor Row as far as Egremont by the Whitehaven, Cleator and Egremont Railway, opening to passengers on 1 July 1857. By the 1860s, the Whitehaven, Cleator and Egremont Railway company sought to extend southwards from Egremont to meet the coastal line at Sellafield, aiming for Millom, Barrow-in-Furness and beyond. The Whitehaven and Furness Junction Railway company opposed this, so the two companies came to an accommodation and built the Egremont to Sellafield extension as a joint line. Beckermet was the sole intermediate passenger station on the extension. The station was on the western edge of the village in Cumbria, England.

Excerpt from the Wikipedia article Beckermet railway station (License: CC BY-SA 3.0, Authors, Images).

Beckermet railway station
Station Crescent,

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Beckermet railway stationContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 54.445 ° E -3.5198 °
placeShow on map

Address

Station Crescent

Station Crescent
CA21 2YU , Beckermet
England, United Kingdom
mapOpen on Google Maps

Beckermet Station 1775893 767431c5
Beckermet Station 1775893 767431c5
Share experience

Nearby Places

Moorside nuclear power station

Moorside nuclear power station is proposed for a site near Sellafield, in Cumbria, England. The original plan by NuGeneration, a British subsidiary of Toshiba-owned Westinghouse Electric Company, had the station coming online from 2024 with 3.4 GW of new nuclear capacity, from three AP1000 reactors. Work up to 2018 would include acquiring the site licence, the development consent order, and other required permits and permissions to start work. Site preparation was to take two years, up to 2020. Following the Chapter 11 bankruptcy of Westinghouse in March 2017, the project was put under review. From December 2017 to July 2018 Kepco was named as preferred bidder. Kepco were thought to prefer their own APR-1400 reactor design for the site, a design which had not yet gone through generic design assessment with the UK's Office for Nuclear Regulation. On 8 November 2018, it was announced that Toshiba's plans for the new nuclear power station had been scrapped and its subsidiary company, NuGen, would be wound up. The Moorside site was handed back to the Nuclear Decommissioning Authority, and the government issued a statement reaffirming its commitment to new nuclear. In July 2020, a EDF-led Moorside consortium announced a proposal for two EPR reactors yielding 3,200 MWe of new nuclear capacity. A second Rolls-Royce-led UK SMR consortium plans a low-carbon power station around a small light-water reactor and the possibility of a link with renewable technologies, storage systems and hydrogen production named Moorside clean energy hub.