place

Pilot Hill, California

1849 establishments in CaliforniaEl Dorado County, California geography stubsUnincorporated communities in CaliforniaUnincorporated communities in El Dorado County, California

Pilot Hill (formerly, Centerville, Pilothill, and Pittsfield) is an unincorporated community in El Dorado County, California. It is located 13 miles (21 km) west-northwest of Placerville, at an elevation of 1175 feet (358 m).In 1849, mining commenced at Pilot Hill. Originally, Centerville, Pilot Hill, and Pittsfield were separate nearby mining camps that unified under the name Centerville. The post office came in 1854 and bestowed the name Pilot Hill. Farm Trails - Pilot Hill is on the Farm Trails Map. Lavender, Olives and Grapes can be picked seasonally at Enchanted April Farm on historic Salmon Falls Road in Pilot Hill.

Excerpt from the Wikipedia article Pilot Hill, California (License: CC BY-SA 3.0, Authors).

Pilot Hill, California
Salmon Falls Road,

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Pilot Hill, CaliforniaContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 38.835 ° E -121.01444444444 °
placeShow on map

Address

Salmon Falls Road 4597
95664
California, United States
mapOpen on Google Maps

Share experience

Nearby Places

Auburn Dam
Auburn Dam

Auburn Dam was a proposed concrete arch dam on the North Fork of the American River east of the town of Auburn, California, in the United States, on the border of Placer and El Dorado Counties. Slated to be completed in the 1970s by the U.S. Bureau of Reclamation, it would have been the tallest concrete dam in California and one of the tallest in the United States, at a height of 680 feet (210 m) and storing 2,300,000 acre-feet (2.8 km3) of water. Straddling a gorge downstream of the confluence of the North and Middle Forks of the American River and upstream of Folsom Lake, it would have regulated water flow and provided flood control in the American River basin as part of Reclamation's immense Central Valley Project. The dam was first proposed in the 1950s; construction work commenced in 1968, involving the diversion of the North Fork American River through a tunnel and the construction of a massive earthen cofferdam. Following a nearby earthquake and the discovery of an unrelated seismic fault that underlay the dam site, work on the project was halted for fears that the dam's design would not allow it to survive a major quake on the same fault zone. Although the dam was redesigned and a new proposal submitted by 1980, spiraling costs and limited economic justification put an end to the project until severe flooding in 1986 briefly renewed interest in Auburn's flood control potential. The California State Water Resources Control Board denied water rights for the dam project in 2008 due to lack of construction progress. Although new proposals surfaced from time to time after the 1980s, the dam was never built for a number of reasons, including limited water storage capacity, geologic hazards, and potential harm to recreation and the local environment. Much of the original groundwork at the Auburn Dam site still exists, and up to 2007, the North Fork American River still flowed through the diversion tunnel that had been constructed in preparation for the dam. Reclamation and Placer County Water Agency completed a pump station project that year which blocked the tunnel, returned the river to its original channel, and diverted a small amount of water through another tunnel under Auburn to meet local needs. However, some groups continue to support construction of the dam, which they state would provide important water regulation and flood protection.