Toa Payoh MRT station
Toa Payoh MRT station is an underground Mass Rapid Transit (MRT) station on the North South line (NSL) in Toa Payoh, Singapore. Located within the town centre of Toa Payoh, this station is integrated with the Toa Payoh Bus Interchange and the HDB (Housing and Development Board) Hub. The station is underneath the junction of Lorong 1 Toa Payoh, Lorong 2 Toa Payoh and Lorong 6 Toa Payoh. The station was constructed as part of Phase I of the MRT system. In August 1985, Toa Payoh station was the first MRT station in Singapore to have its concrete structure completed. On 7 November 1987, the station was one of the first MRT stations to open for revenue service. The station has a bright yellow scheme with a set of coloured tiles at the concourse level.
Excerpt from the Wikipedia article Toa Payoh MRT station (License: CC BY-SA 3.0, Authors, Images).Toa Payoh MRT station
Lorong 2 Toa Payoh, Singapore Toa Payoh
Geographical coordinates (GPS) Address External links Nearby Places Show on map
Continue reading on Wikipedia
Geographical coordinates (GPS)
Latitude | Longitude |
---|---|
N 1.3327777777778 ° | E 103.8475 ° |
Address
Toa Payoh
Lorong 2 Toa Payoh
310175 Singapore, Toa Payoh
Singapore
Open on Google Maps