place

Yaba, Lagos

Geography of LagosNeighborhoods of LagosYaba, Lagos
Yaba Local Council Development Area, Adekunle
Yaba Local Council Development Area, Adekunle

Yaba is a suburb located on Lagos Mainland, Lagos in Lagos State, Nigeria. There are several federal government institutions in the area, which include Queen's College, the Nigerian Institute of Medical Research, the Yaba College of Technology, Igbobi College, the University of Lagos, the Federal Science and Technical College, and the Federal College of Education (Technical) Akoka. Yaba has one of the busiest market sites in Lagos, known as Tejuosho Market. The old Tejuosho market was demolished in 2008 and rebuilt into a modern shopping complex by the end of 2014. Directly opposite the Yaba market is a psychiatric hospital popularly known by many Lagosians as Yaba Left. Yaba is one of the go-to places for technology renaissance in Africa, with tech startups such as Hotels.ng, Andela, Cc-Hub and many others with a positive impact on the economy. The redevelopment of the Tejuosho Market, which was undertaken as part of the Lagos Megacity Project, has transformed it into a major shopping center for Lagosians. The market complex houses various facilities including boutiques, food stores, and a sports center.

Excerpt from the Wikipedia article Yaba, Lagos (License: CC BY-SA 3.0, Authors, Images).

Yaba, Lagos
Olumo Street,

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Yaba, LagosContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 6.5097 ° E 3.3863 °
placeShow on map

Address

Olumo Street

Olumo Street
100231
Lagos State, Nigeria
mapOpen on Google Maps

Yaba Local Council Development Area, Adekunle
Yaba Local Council Development Area, Adekunle
Share experience

Nearby Places

Third Mainland Bridge
Third Mainland Bridge

Third Mainland Bridge is the longest of three bridges connecting Lagos Island to the mainland, the others are the Eko and Carter bridges. It was the longest bridge in Africa until 1996 when the 6th October Bridge located in Cairo was completed. The bridge starts from Oworonshoki which is linked to the Apapa-Oshodi expressway and Lagos-Ibadan expressway, and ends at the Adeniji Adele Interchange on Lagos Island. There is also a link midway through the bridge that leads to Herbert Macaulay Way, Yaba. The bridge was built by Julius Berger Nigeria PLC. The phase one of the project was commissioned by President Shehu Shagari in 1980 and completed by President Ibrahim Babangida in 1990; it measures about 11.8 km in length. By 2006, many commuters had reported that the Third Mainland Bridge was vibrating noticeably, indicating that it needed urgent attention. As a result, remedial work was commenced on portions of the bridge at different times, leading to intermittent partial closure of the bridge. In January 2013, this work was completed. Recently, there have been rumours of cracks on the bridge. This, however, was denied by authorities. The eight-lane bridge experienced a new look during the last repairing exercise, painting the bridge guide with the colours of Nigeria: green, white, green, and also general painting was done out for a new look. The repair works on the bridge were completed and the bridge was reopened on October 30, 2012. The Third Mainland Bridge has very high vehicular traffic on weekdays, as many residents commute to and from the Lagos Mainland to the Island, which is the commercial hub of Lagos State. Residents in Ikeja, Agboyi-Ketu, Ikorodu, Isheri, Oworonshoki, Gbagada, Yaba, Maryland and Oshodi often use the bridge on their daily commutes. The Third Mainland Bridge is an essential part of Lagos' daily commuting, and as such requires to be constantly renovated. It has also come to be a major Lagos icon, offering different views of Lagos -- the Lagos Lagoon, the University of Lagos waterfront and Makoko, a shanty town built on the Lagos Lagoon. On 6 July 2020, it was announced that the Third Mainland Bridge will be closed for six months due to repairs. The bridge was to undergo another round of repairs from Friday, July 24, 2020 to January 24, 2021 for the replacement of bearings and worn-out expansion joints.