place

Llannewydd

Carmarthenshire geography stubsVillages in Carmarthenshire

Llannewydd or Newchurch is a parish in Carmarthenshire, Wales. It is 3 miles (5 km) north of Carmarthen on the banks of the Gwili. The church was rebuilt in 1829.

Excerpt from the Wikipedia article Llannewydd (License: CC BY-SA 3.0, Authors).

Geographical coordinates (GPS)

Latitude Longitude
N 51.898 ° E -4.34 °
placeShow on map

Address


SA33 6EP , Newchurch and Merthyr
Wales, United Kingdom
mapOpen on Google Maps

Share experience

Nearby Places

Bronwydd Arms railway station
Bronwydd Arms railway station

Bronwydd Arms railway station, originally a stop on the now closed Carmarthen to Aberystwyth Line, is the headquarters of the preserved Gwili Railway. The station first opened on 3 September 1860 as part of the Carmarthen and Cardigan Railway and closed to passengers on 22 February 1965. Following closure, the station building and signal box were demolished, leaving behind only a bare platform. In 1978, the Gwili Railway re-opened the station and gradually rebuilt the station building and signal box using redundant buildings recovered from the Heart of Wales Line. The station building was constructed from Llandovery signal box, clad with components from Ammanford (GWR) railway station, while the signal box from Llandybie was also recovered and is now used as the 'new' Bronwydd Arms signal box. A third box from central Wales, Ffairfach, is also in use as a museum.Other smaller items have been incorporated into the rebuilt station, such as Great Western Railway lamp posts and benches, a parcels shed and a water tower, recovered from Barry Docks in 1979. The station features a level crossing with wooden gates at the south end where the railway crosses the B4301 road. Passenger trains now currently use the crossing which had been brought into use as part of the railway's extension to Abergwili Junction. In 2010 the level crossing was renewed to enable the original two-gate system to be re-instated in GWR style, thus re-creating another feature of the original station. The crossing and its gates were completed by August 2011. Work had been concentrated on the extension of the line to Abergwili Junction which later re-opened in July 2017.