Herrenwyk power station
Herrenwyk power station was a coal-fired power station in Lübeck-Herrenwyk, Germany. It was the first regional power station in Schleswig-Holstein. The power station was owned and operated by Nordwestdeutsche Kraftwerke Aktiengesellschaft (now part of E.ON). Construction of the power station started in 1910 and the power station was commissioned on 11 June 1911. In 1955, a new 25 megawatt (MW) unit was commissioned. In 1992, the Lübeck-Herrenwyk power station was demolished after the bankruptcy and demolition of a local metallurgical plant. There was a proposal to build a new 400 MW power station at the site of the demolished power station. However, in 2000 E.ON abandoned this project because of the existing overcapacity in the electricity market. In 1994, the Baltic Cable's static invertor plant was built on the site of former power station.
Excerpt from the Wikipedia article Herrenwyk power station (License: CC BY-SA 3.0, Authors, Images).Herrenwyk power station
Alt Herrenwyk, Lübeck Herrenwyk (Kücknitz)
Geographical coordinates (GPS) Address Nearby Places Show on map
Continue reading on Wikipedia
Geographical coordinates (GPS)
Latitude | Longitude |
---|---|
N 53.89988 ° | E 10.80223 ° |
Address
Alt Herrenwyk
Alt Herrenwyk
23569 Lübeck, Herrenwyk (Kücknitz)
Schleswig-Holstein, Germany
Open on Google Maps