place

Newlincs EfW facility

Buildings and structures in GrimsbyWaste stubs
Grimsby incinerator
Grimsby incinerator

The Newlincs EfW facility is an incinerator which is located in Grimsby, North East Lincolnshire, England. The plant is operated by Cyclerval UK & TIRU Group under a PFI contract. The engineering of the facility is unusual as it consists of an oscillating kiln handling 56,000 tonnes of waste per year/7 tonnes per hour of waste. The facility is capable of generating 3.2 MW electricity.

Excerpt from the Wikipedia article Newlincs EfW facility (License: CC BY-SA 3.0, Authors, Images).

Newlincs EfW facility
North Wall,

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Newlincs EfW facilityContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 53.6063 ° E -0.1439 °
placeShow on map

Address

North Wall
DN31 2AN , Stallingborough
England, United Kingdom
mapOpen on Google Maps

Grimsby incinerator
Grimsby incinerator
Share experience

Nearby Places