The Illinois Quantum and Microelectronics Park (IQMP) is a planned 128-acre technology campus on the site of the former U.S. Steel South Works in South Chicago. It will focus on quantum computing and is not an AI data center. Plans for the IQMP are part of the larger “Quantum Shore Chicago” redevelopment of the former U.S. Steel South Works site, a long-vacant industrial area in Chicago’s South Shore neighborhood. The broader project is expected to include advanced manufacturing facilities, research centers, housing, and a replacement hospital, with an initial phase estimated at about $9 billion in investment. The overall park is expected to cost $9 billion to construct. Work is expected to begin in 2026 and be complete in 2028.

Excerpt from the Wikipedia article Illinois Quantum and Microelectronics Park (License: CC BY-SA 3.0, Authors).

Illinois Quantum and Microelectronics Park
East 87th Street, Chicago South Chicago

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Illinois Quantum and Microelectronics ParkContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 41.735047222222 ° E -87.534255555556 °
placeShow on map

Address

East 87th Street

East 87th Street
60617 Chicago, South Chicago
Illinois, United States
mapOpen on Google Maps

Share experience

Nearby Places

South Chicago (93rd Street) station
South Chicago (93rd Street) station

South Chicago (93rd Street) station is a Metra Electric Line station on East 93rd St and South Baltimore Avenue (9300 S, 3300 E) in Chicago's South Chicago neighborhood. The station provides transport services to Chicago's South Chicago, South Deering, and East Side neighborhoods. The station is located 13.0 miles (20.9 km) southeast of Millennium Station, the line's northern terminus at Randolph/South Water Street in downtown Chicago. As of 2018, South Chicago (93rd Street) is the 101st busiest of Metra's 236 non-downtown stations, with an average of 472 weekday boardings.The South Chicago Branch, a 4.7-mile (7.6 km) spur line, was built for the Illinois Central Railroad (IC). The IC operated the South Chicago Branch from startup in 1883 until the line was sold, with the rest of Metra Electric, to the public sector in 1987. The line was electrified in 1926. In 2001, Metra built the 93rd Street terminus as a replacement for the 91st Street (South Chicago) terminal.This station is the only outbound Metra terminus located within the corporate limits of the city of Chicago. It is 6 blocks south of the 87th Street Metra Electric South Chicago Branch station. Travel time to Van Buren/Jackson Street station in Downtown Chicago is about 35 minutes.A station typology adopted by the Chicago Plan Commission on October 16, 2014 assigns the South Chicago 93rd Street station a typology of Local Activity Center. A Local Activity Center is primarily characterized by the Metra station being the central focus of a built-up and identifiable neighborhood.