place

U.S. Geological Survey National Center

1974 establishments in VirginiaBuildings and structures in Fairfax County, VirginiaGovernment buildings completed in 1974Government buildings on the National Register of Historic Places in VirginiaNational Register of Historic Places in Fairfax County, Virginia
Office buildings completed in 1974Office buildings in VirginiaUnited States Geological Survey
Usgs headquarters
Usgs headquarters

The U.S. Geological Survey National Center, officially the John Wesley Powell Federal Building, is a historic building and the headquarters of the United States Geological Survey (USGS)—an agency of the U.S. Department of the Interior (DOI)—located in Reston, Virginia. Built in 1974, it was listed on the National Register of Historic Places in 2020.

Excerpt from the Wikipedia article U.S. Geological Survey National Center (License: CC BY-SA 3.0, Authors, Images).

U.S. Geological Survey National Center
USGS Trek Through Time, Reston

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: U.S. Geological Survey National CenterContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 38.9497 ° E -77.3676 °
placeShow on map

Address

USGS Trek Through Time

USGS Trek Through Time
20192 Reston
Virginia, United States
mapOpen on Google Maps

Usgs headquarters
Usgs headquarters
Share experience

Nearby Places

Herndon station
Herndon station

Herndon (preliminary names Herndon–Monroe, Herndon–Reston West) is a planned Washington Metro station in Fairfax County, Virginia on the Silver Line. The station would be in the median strip of VA-267 adjacent to the current Herndon-Monroe Park and Ride parking garage and bus station, which is on the south side of the highway. This location is in Reston, but has a Herndon postal address. In anticipation of a future mass transit route in the Dulles Access Road median, in 1999 Fairfax County constructed a $20 million park and ride facility which includes a Fairfax Connector station that serves most bus lines in the Herndon and Reston areas as well as buses carrying commuters to the West Falls Church or other Metro stations daily. The existing facility is served by direct westbound on-ramps and eastbound off-ramps to SR 267. The existing parking garage has 1,750 spaces. The garage has drawn criticism because of alleged construction flaws. The garage will be expanded to 3,500 spaces for the Metro station. Originally planned for revenue operations in 2018, the station is now expected to open in July 2022. In the meantime, the Town of Herndon has initiated transportation oriented development of the land on the north side of the station. In turn, the Town of Herndon, on November 10, 2009, designated commercial, industrial and multi-unit rental residential properties within the town boundaries for inclusion in a special tax district to fund construction of Phase II of the Silver Line.