Alcove (Nashville)
Alcove is a 419 ft (128 m), 34 story skyscraper in Nashville, Tennessee. Construction started in 2021 and finished in 2023 after originally being proposed in 2020. It is located at the intersection of Ninth and Church Street, adjacent to the Nashville Yards district. The building contains 356 residential units and 375,800 sq ft (34,910 m2) of space. Alcove's design is intended to resemble Amazon boxes stacked on top of each other, referencing the Amazon offices two blocks away. The building became noted in 2023 for being the first building in Nashville to use a Mitsubishi Electric elevator that includes touch-free calling capabilities. In October 2024, Alcove won the category of best skyscraper in the 100-199 meter category as designated by the Chicago-based Council on Tall Buildings and Urban Habitat (CTBUH). It is the first building in Nashville to be recognized by the firm in this way.
Excerpt from the Wikipedia article Alcove (Nashville) (License: CC BY-SA 3.0, Authors, Images).Alcove (Nashville)
Church Street, Nashville-Davidson
Geographical coordinates (GPS) Address Phone number External links Nearby Places Show on map
Geographical coordinates (GPS)
| Latitude | Longitude |
|---|---|
| N 36.161388888889 ° | E -86.784722222222 ° |
Address
Orangetheory Fitness
Church Street 1022
37203 Nashville-Davidson
Tennessee, United States
Open on Google Maps