Wilhelmshaven LNG terminal
Wilhelmshaven LNG terminal is Germany's first liquefied natural gas (LNG) shipping terminal, situated near Wilhelmshaven, Germany on the North Sea. It had been in the planning stages since the mid-2010s, and in 2022 gained rapid regulatory authority approval for construction following the Russian invasion of Ukraine and the global natural gas supply crisis. The terminal was opened on 17 December 2022 with 165 thousand cubic metres (5.8 million cubic feet) of LNG imported from Sagunto following completion of construction in November 2022.The terminal received its commissioning load of LNG in December 2022, slightly ahead of schedule which had been January 2023.
Excerpt from the Wikipedia article Wilhelmshaven LNG terminal (License: CC BY-SA 3.0, Authors, Images).Wilhelmshaven LNG terminal
Am Tiefen Fahrwasser, Wangerland
Geographical coordinates (GPS) Address Website External links Nearby Places Show on map
Continue reading on Wikipedia
Geographical coordinates (GPS)
Latitude | Longitude |
---|---|
N 53.6417 ° | E 8.1089 ° |
Address
LNG-Terminal Wilhelmshaven
Am Tiefen Fahrwasser
26388 Wangerland, Voslapper Groden
Lower Saxony, Germany
Open on Google Maps