place

Uttara South metro station

Dhaka Metro stationsRailway stations in Bangladesh opened in 2023Transport in Uttara
Uttara South 01
Uttara South 01

Uttara South (Bengali: উত্তরা দক্ষিণ, romanised: Uttora dokkhin) is an elevated metro station of the Dhaka Metro's MRT Line 6. This station is located in Uttara, a suburb of Dhaka. It is estimated that the station will be opened on the last week of March 2023. It became operational from 31 March 2023.

Excerpt from the Wikipedia article Uttara South metro station (License: CC BY-SA 3.0, Authors, Images).

Uttara South metro station
Road 17, Dhaka Mirpur Cantonment

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Uttara South metro stationContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 23.8456 ° E 90.36314 °
placeShow on map

Address

উত্তরা দক্ষিণ

Road 17
1216 Dhaka, Mirpur Cantonment
Dhaka Division, Bangladesh
mapOpen on Google Maps

Uttara South 01
Uttara South 01
Share experience

Nearby Places

Mirpur–Uttara Road
Mirpur–Uttara Road

Mirpur–Uttara Road (Bengali: মিরপুর–উত্তরা রোড) is a street in Dhaka, Bangladesh, that was built for the construction of the Mirpur DOHS-to-Uttara section of Dhaka Metro Rail's MRT Line 6. Before the line's construction, the road was a narrow path, which in 2016 was planned to be converted into a street because, due to its narrowness, the line's viaduct could not be built on it. The road runs from the Mirpur Cantonment area to Sector 18 of Uttara and a roundabout at Diabari. During the construction of the MRT Line 6, the 800-metre (2,600 ft) stretch of the road from Mirpur 12 to Uttara South metro station was constructed with broken bricks; the narrow section was quickly finished to mark the line's inauguration in 2022. The road was later extended to connect with Mirpur and Uttara, and is currently the only road linking the two areas. The construction of this 4.5-kilometre (2.8 mi)-long street connecting Sonargaon Janapath with Mirpur DOHS reduced the travel time between Mirpur and Uttara. During the construction of Dhaka BRT, traffic congestion on Airport Road increased and drivers started using this street as an alternative. According to the master plan of Dhaka North City Corporation's (DNCC) Detailed Area Plan, a road has been proposed from the end of the street; from Diabari Roundabout to Gazipur. In 2022, Salehuddin Ahmed, who was involved in Dhaka's bus-route rationalization project, said this street would be included in the project's route. The section of the street from Mirpur 12 to Uttara South metro station, however, is not wide enough, causing traffic jams and inconvenience to the passengers. Dhaka Mass Transit Company Limited (DMTCL) constructed the road and, according to DNCC, they are not in possession of it so are unable to address the issue. In 2023, M.A.N. Siddique, the then-Managing Director of DMTCL, said they had written to the authorities asking to take over responsibility for the road. In addition, the 800-metre (2,600 ft)-long section has become prone to accidents due to its collapse after its inauguration. In 2024, the then-DNCC mayor Atiqul Islam stated the authorities were trying to rebuild the section. On 20 December 2023, in a DNCC meeting, a proposal to name the street after Patua Quamrul Hassan, who designed the revised version of the flag of Bangladesh, was accepted. In May 2024, it was reported that DNCC forwarded the approved proposal to the Ministry of Local Government, Rural Development and Co-operatives. As of December 2024, according to users of the problematic street, they have been facing difficulties for several years, yet the authorities have not shown sincerity in repairing it. Later, on 11 March 2025, the MP Checkpost-to-Uttara South metro station section was closed for repairs, and after completion of the repairs, it was reopened on 14 March 2025. Mohammad Azaz, The administrator of Dhaka North City Corporation, stated that the repaired section will be replaced by a bridge in the future to protect Khidir Canal.

RUAP
RUAP

RAJUK Uttara Apartment Project (abbreviated as RUAP) is a residential area located in Sector 18 of Uttara, Dhaka, Bangladesh. It is the first and largest apartment project in the country. Rajdhani Unnayan Kartripakkha launched this project in 2011 to ensure housing in the metropolis for low and middle-income people, targeting an estimated population of 80,000, with a completion period of five years. The construction project included 240 sixteen-storey buildings on 214 acres land, with a total of 18,732 apartments. The buildings were divided into three blocks. In 2019, the project period was extended to 2022, with a final budget of ৳10,586 crore. As of 2021, about 2,000 families were living there. In November 2020, it was revealed that 281 apartments of the project had been allocated through lobbying and bribes instead of a lottery system. After the launch of MRT Line 6 in 2022, the demand for apartments in the project area increased. It was reported that 450 apartments of the project were still unsold. In 2024, the construction progress of Block A of the project reportedly reached 95%, and the authorities were expected to complete the construction by December of the same year. Later, the project duration was extended to June 2025. Although construction of 79 buildings in Block A was completed under the project, the Cabinet Committee on Government Purchase cancelled the plan to build buildings of the B and C block with financial and technical assistance from the Malaysian government. As a result, the Project Implementation Committee and Project Steering Committee decided to create separate projects for Blocks B and C. Consequently, Rajdhani Unnayan Kartripakkha proposed a new project with a budget of ৳16,827 crore to construct 7,544 apartments in two blocks with a target completion year of 2030. However, since no feasibility study had been conducted as required for a project worth more than ৳50 crore, objections were raised about the project at a meeting of the Project Evaluation Committee in June 2025.