place

Hutzot HaMifratz railway station

2001 establishments in IsraelRailway stations in HaifaRailway stations opened in 2001
תמונתחוצותהמפרץ
תמונתחוצותהמפרץ

Hutzot HaMifratz railway station (Hebrew: תחנת הרכבת חוצות המפרץ, Taḥanat HaRakevet Ḥutzot HaMifratz) is an Israel Railways passenger station serving Hutzot HaMifratz Mall (Hebrew: קניון חוצות המפרץ), Israel's largest open-air mall, and the surrounding Haifa Bay industrial zone in the north of Haifa.

Excerpt from the Wikipedia article Hutzot HaMifratz railway station (License: CC BY-SA 3.0, Authors, Images).

Hutzot HaMifratz railway station
Haifa

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Hutzot HaMifratz railway stationContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 32.809497222222 ° E 35.054541666667 °
placeShow on map

Address


2630050 Haifa
Haifa District, Israel
mapOpen on Google Maps

תמונתחוצותהמפרץ
תמונתחוצותהמפרץ
Share experience

Nearby Places

Highway 22 (Israel)

Highway 22 (Hebrew: כביש 22), also known as the Bay Highway, is a suburban freeway in the Haifa metropolitan area connecting downtown Haifa with the city's northern exit to the Krayot. From there it continues northwards as a bypass of the Krayot, providing an alternative route to Highway 4. The highway is divided into two parts: The Kishon Road is a 5 km long urban section from the Hiram interchange in downtown Haifa to the Yigael Yadin interchange. The first stage of the Kishon Road was built by Haifa's municipal Yefe Nof company and opened in 2005. The Mevo Carmel Interchange opened on January 12, 2010, eliminating a dangerous railway crossing on the way to the Krayot. The Krayot Bypass is a 12 km long suburban section bypassing the Krayot area. There have been plans to create an alternative road to the congested Haifa - Acre road since the 1970s, however financial and bureaucratic issues prevented these plans from being realized for several decades. Shapir Marine and Civil Engineering Ltd. won the tender to construct this part of the highway, work on which commenced in 2010. The entire cost of this segment is estimated at NIS 1.9 billion (approximately US$500 million in 2010 dollars) and was managed by the National Roads Authority. Other works in the vicinity of the highway included the construction of connections from the highway to the Carmel Tunnels and Highway 75 and improvements to Highway 4 from the Karey Na'aman interchange to just south of Acre. The southern part of the Krayot Bypass, from Haifa to the Bialik Interchange was completed mid-September 2012, ahead of schedule. The last section leading to Karei Na'aman Interchange was completed in March 2013. A direct connection between the highway and the Carmel Tunnels (Highway 23) was completed in March 2014.