place

UTS Central

Buildings and structures completed in 2019Buildings and structures in SydneyNeo-futurist architecture in AustraliaUniversity and college buildings and structures in AustraliaUniversity of Technology Sydney
Use Australian English from July 2013
University of Technology Sydney, Central Building (Building 2) 2022
University of Technology Sydney, Central Building (Building 2) 2022

UTS Central, also known as Building 2, is the building housing the Faculty of Law and UTS Library at the University of Technology Sydney. It is the final building to be opened under the A$1 billion City Campus Master Plan. The building is designed by Francis-Jones Morehen Thorp (FJMT), with elements of an original podium design by Lacoste+Stevenson in association with DJRD. Construction was overseen by head contractor Richard Crookes Constructions. The building is located next to the UTS Tower in Ultimo. It opened in August 2019.

Excerpt from the Wikipedia article UTS Central (License: CC BY-SA 3.0, Authors, Images).

UTS Central
Broadway, Sydney Ultimo

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: UTS CentralContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N -33.88367 ° E 151.20013 °
placeShow on map

Address

UTS Library

Broadway 61
2007 Sydney, Ultimo
New South Wales, Australia
mapOpen on Google Maps

University of Technology Sydney, Central Building (Building 2) 2022
University of Technology Sydney, Central Building (Building 2) 2022
Share experience

Nearby Places