place

Middle Branch Croton River

AC with 0 elementsNew York (state) river stubsRivers of New York (state)Rivers of Putnam County, New YorkRivers of Westchester County, New York
Tributaries of the Hudson River
Crotonrivermap
Crotonrivermap

The Middle Branch Croton River is a tributary of the Croton River in Putnam and Westchester counties in the state of New York. It lies within the Croton River watershed and is part of the New York City water supply system's Croton Watershed.

Excerpt from the Wikipedia article Middle Branch Croton River (License: CC BY-SA 3.0, Authors, Images).

Middle Branch Croton River
Stoneleigh Avenue,

Geographical coordinates (GPS) Address Nearby Places
placeShow on map

Wikipedia: Middle Branch Croton RiverContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 41.3701 ° E -73.6626 °
placeShow on map

Address

Stoneleigh Avenue 521
10512
New York, United States
mapOpen on Google Maps

Crotonrivermap
Crotonrivermap
Share experience

Nearby Places

Croton Falls Reservoir

The Croton Falls Reservoir is a reservoir in the New York City water supply system in the Putnam County, New York townships of Carmel, and Southeast, roughly 50 miles (80 km) north of New York City. Part of the system's Croton Watershed, it was formed by impounding the West Branch and Middle Branch of the Croton River, tributaries of the Croton River, which flows into the Hudson River. Placed into service in 1911, the resulting reservoir has a drainage basin of 16 square miles (25.6 km²) and can hold 14.2 billion US gallons (54,000,000 m3) of water at full capacity. This includes all bodies of water that flow into the reservoir except for other reservoirs. Water sources in the basin include Michaels Brook, and Lake Gilead, one of three controlled lakes in the Croton Watershed. The reservoir is split into three portions by Putnam County Routes 35 and 38, which cross it with causeways and bridges. Water from the reservoir flows into Westchester County, New York, through the Muscoot Reservoir and New Croton Reservoir before entering the New Croton Aqueduct. Water in the Aqueduct flows through The Bronx into the Jerome Park Reservoir. In January 2007, the New York City Department of Environmental Protection reportedly began a $74 million project of improvements to the Croton Falls Reservoir and the Diverting Reservoir. The upgrading and rehabilitation is part of the city's effort to comply with state and federal dam safety regulations. At the Croton Falls Reservoir, the spillway - the structure that allows excess water to leave the reservoir - will be widened and deepened. The nearly 100-foot-tall (30 m) earthen and masonry dam will be resurfaced, a new bridge will be built over the redone spillway and various mechanical items, such as valves, will be replaced. In addition, cables anchoring the dam and spillway to the bedrock will be installed. The work will require the reservoir to be deepened 4 feet (1.2 m). The connecting channel between the two reservoirs will be emptied, inspected and dredged. Construction at both sites is expected to continue until Jan. 31, 2010.

Diverting Reservoir

The Diverting Reservoir is a reservoir in the New York City water supply system in the town of Southeast, New York, in Putnam County immediately south of the village of Brewster, New York. Part of the system's Croton Watershed, it lies about 50 miles (80 km) north of New York City. Construction impounding the East Branch Croton River began early in the 20th century and was completed by 1911. The Diverting reservoir holds 900 million US gallons (3,400,000 m3) of water at full capacity, making it the smallest in New York City's water supply outside the City itself. Its drainage basin represents 8 square miles (21 km2) of the Croton River watershed. This basin includes the lakes, streams, rivers, and other bodies of water that flow into the reservoir. The Diverting Reservoir is also connected to the nearby Croton Falls Reservoir via a channel and dividing weir allowing water to freely pass between. The water in Diverting Reservoir flows into the continuation of the East Branch, which then joins the flow of the West Branch, itself carrying the flow of the Middle Branch, amid the headwaters of the Muscoot Reservoir, the collecting point for most of the Croton Watershed. It continues into the New Croton Reservoir, the final collecting point, then the New Croton Aqueduct. Water from the Aqueduct flows into the Jerome Park Reservoir. In January 2007, the New York City Department of Environmental Protection began a $74 million project of improvements to the Croton Falls Reservoir and the Diverting Reservoir. (See Journal-News article dated Feb. 28, 2007) The upgrading and rehabilitation is part of the city's effort to comply with state and federal dam safety regulations. The work at the Diverting Reservoir includes new valves and pipes, along with redoing the spillway and some of the concrete surfaces on the 55-foot (17 m)-high dam. The connecting channel between the two reservoirs will be emptied, inspected and dredged. Construction at both sites is expected to continue until Jan. 31, 2010.