East Coast Integrated Depot
The East Coast Integrated Depot (Chinese: 东海岸综合车厂; Malay: Depot Bersepadu East Coast), is a future integrated bus and train depot located in Changi that will serve the East West Line, Downtown Line and Thomson-East Coast Line of the Mass Rapid Transit (MRT) in Singapore. The depot, with an expected completion date of 2025, will be located beside the current site of Changi Depot, which will be demolished. It will be the first MRT depot in Singapore to serve 3 MRT lines and also the third to be integrated with a bus depot in Singapore after the Tuas West Depot on the East West Line and Gali Batu Depot on the Downtown Line. With this design, it is estimated that there will be a saving of 44 hectares of land, equivalent to approximately 60 football fields, considering that Singapore is a land-scarce country. The depot will be able to house approximately 200 trains of varying sizes and lengths and 550 buses within the site.
Excerpt from the Wikipedia article East Coast Integrated Depot (License: CC BY-SA 3.0, Authors).East Coast Integrated Depot
Upper Changi Road East,
Geographical coordinates (GPS) Address Nearby Places Show on map
Continue reading on Wikipedia
Geographical coordinates (GPS)
Latitude | Longitude |
---|---|
N 1.32736 ° | E 103.95734 ° |
Address
Upper Changi Road East
Upper Changi Road East
486593 , Bedok South
Singapore
Open on Google Maps