Harbor Bridge Project
Bridges in TexasBridges under constructionBuildings and structures in Corpus Christi, TexasCable-stayed bridges in the United StatesProposed bridges in the United States ... and 1 more
Use mdy dates from October 2022
The Harbor Bridge Project (or New Harbor Bridge or US 181 Harbor Bridge) is the replacement of the existing through arch bridge that crosses the Corpus Christi Ship Channel, which serves the Port of Corpus Christi in Corpus Christi, Texas, with a modern cable-stayed bridge design. The route will connect with SH 286 (the Crosstown Expressway) at its southern terminus and US 181 on the north. Groundbreaking on construction took place on August 8, 2016 and was scheduled to be completed by the spring of 2020, but was extensively delayed due to engineering and design issues, and is tentatively planned to be completed in 2025.
Excerpt from the Wikipedia article Harbor Bridge Project (License: CC BY-SA 3.0, Authors).Harbor Bridge Project
New Harbor Bridge, Corpus Christi Downtown
Geographical coordinates (GPS) Address Nearby Places Show on map
Geographical coordinates (GPS)
| Latitude | Longitude |
|---|---|
| N 27.813486111111 ° | E -97.39895 ° |
Address
New Harbor Bridge
New Harbor Bridge
78402 Corpus Christi, Downtown
Texas, United States
Open on Google Maps