Hunterston B nuclear power station
Hunterston B nuclear power station is a shut-down AGR nuclear power station in North Ayrshire, Scotland. Located about 6 miles (9.7 km) south of Largs and about 2.5 miles (4.0 km) northwest of West Kilbride on the Firth of Clyde coast. It is currently operated by EDF Energy, and began producing electricity in 1976. The station ceased generation on 7 January 2022. On 19 May 2022, EDF announced that defueling was started on the two Hunterston B units. This process is expected to take over three years to complete, and it involves the complete emptying of all fuel channels from both reactors. This amounts to over 300 channels from each reactor, each containing 8 fuel elements. Fully loaded flasks containing the used fuel are scheduled to be dispatched from the site by rail to Sellafield at a maximum rate of three per week.Hunterston B is similar in design to sister station Hinkley Point B, which ceased operations in August 2022.
Excerpt from the Wikipedia article Hunterston B nuclear power station (License: CC BY-SA 3.0, Authors, Images).Hunterston B nuclear power station
Hunterston 'A' Service Road,
Geographical coordinates (GPS) Address Nearby Places Show on map
Continue reading on Wikipedia
Geographical coordinates (GPS)
Latitude | Longitude |
---|---|
N 55.7221 ° | E -4.8901 ° |
Address
Hunterston 'A' Service Road
KA23 9QX
Scotland, United Kingdom
Open on Google Maps