place

California City Correctional Facility

2006 establishments in CaliforniaBuildings and structures in Kern County, CaliforniaCalifornia City, CaliforniaCoreCivicPrisons completed in the 2000s
Prisons in CaliforniaUse mdy dates from December 2022
California City Correctional Center (14192903524)
California City Correctional Center (14192903524)

California City Correctional Facility (CAC) is a secure facility owned by CoreCivic. It was formerly staffed and operated by the California Department of Corrections and Rehabilitation as a men's level II (low-medium) security prison. The facility was built on speculation, without any customer contract to fill it. Construction was completed in 1998. Beginning in 2006, it housed federal inmates for the U.S. Marshals Service and U.S. Immigration and Customs Enforcement. The federal contract included daily transportation to the San Diego County Courthouse and Southern Nevada Correctional Center, and as-needed to JPATS-Victorville ("Con Air"). The per-diem rate in 2010 was $77.50 per prisoner, decreasing to $58.00 as the count increased. The federal use of the facility ended in 2013. In response to a federal order to reduce overcrowding at the state's prison facilities, the California Department of Corrections and Rehabilitation started leasing the facility in 2013 for $28.5 million yearly. Former guards, previously privately contracted, transferred to become state correctional officers after eight weeks of training. CAC was the only CDCR state prison under this arrangement; all other state prisons are both owned and operated by CDCR. All inmates were moved out by November 2023. The state terminated its lease so the prison will be effectively closed by March 2024.

Excerpt from the Wikipedia article California City Correctional Facility (License: CC BY-SA 3.0, Authors, Images).

California City Correctional Facility
Virginia Boulevard,

Geographical coordinates (GPS) Address External links Nearby Places
placeShow on map

Wikipedia: California City Correctional FacilityContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 35.152846 ° E -117.859225 °
placeShow on map

Address

California City Correctional Facility

Virginia Boulevard 22844
93505
California, United States
mapOpen on Google Maps

linkWikiData (Q27987118)
linkOpenStreetMap (174547688)

California City Correctional Center (14192903524)
California City Correctional Center (14192903524)
Share experience

Nearby Places

Beacon Solar Project

The Beacon Solar Project is a photovoltaic power station in the northwestern Mojave Desert, near California City in eastern Kern County, California. Split into five phases, the combined Beacon solar facilities generate 250 MW of renewable energy for the Los Angeles Department of Water and Power (LADWP). The five phases of the project, fully completed in December 2017, include a total of 903,434 individual solar photovoltaic modules, mounted onto Nextpower single-axis tracking systems. The Beacon Solar Project was originally proposed by NextEra Energy using parabolic trough mirrors as solar energy collectors for a solar thermal electric energy generation project. The solar thermal electric powerplant technology configuration raised significant concerns during the CEQA environmental permitting process. Among the many environmental concerns, the natural gas supply, the wastewater management and disposal, and the water supply during construction and during operation of the plant were concerns specific to the solar thermal technology. The project was reconfigured, simplified and rescoped to a photovoltaic technology, eliminating the solar thermal technology concerns, though significant other environmental concerns remained. LADWP acquired the entire project, including the land and the environmental permitting for the site in 2012 as photovoltaic technology, which gained economic advantages over solar thermal and other technologies as a result of rapidly decreasing costs of solar photovoltaic modules. LADWP contracted Hecate Energy to develop three phases of the project, for 162 MW, and SunEdison, to develop the other two phases, for 88 MW. SunEdison's stake in the project was later acquired by Capital Dynamics. Hecate Energy's stake in the project was acquired by sPower (Sustainable Power), and was completed by sPower, who was later acquired by AES. In October 2018, LADWP commissioned the Beacon Battery Energy Storage System (BESS), with 10 MWh/20 MW of storage to stabilize the energy sent to the grid by the solar panels.