place

The Continuity of Life Forms

1959 establishments in Oregon1959 in art2014 disestablishments in Oregon2016 establishments in OregonArt in Portland, Oregon
Modern artMosaicsOregon Zoo
The Continuity of Life Forms mosaic
The Continuity of Life Forms mosaic

The Continuity of Life Forms is a mosaic by Willard Martin, installed at the Oregon Zoo in Portland, Oregon.

Excerpt from the Wikipedia article The Continuity of Life Forms (License: CC BY-SA 3.0, Authors, Images).

The Continuity of Life Forms
Southwest Canyon Road, Portland Goose Hollow

Geographical coordinates (GPS) Address Phone number Website Nearby Places
placeShow on map

Wikipedia: The Continuity of Life FormsContinue reading on Wikipedia

Geographical coordinates (GPS)

Latitude Longitude
N 45.508666666667 ° E -122.71602777778 °
placeShow on map

Address

Oregon Zoo

Southwest Canyon Road 4001
97221 Portland, Goose Hollow
Oregon, United States
mapOpen on Google Maps

Phone number
Metro

call+15032261561

Website
oregonzoo.org

linkVisit website

The Continuity of Life Forms mosaic
The Continuity of Life Forms mosaic
Share experience

Nearby Places

Washington Park and Zoo Railway
Washington Park and Zoo Railway

The Washington Park & Zoo Railway (WP&ZRy) is a 2 ft 6 in (762 mm) narrow gauge recreational railroad in Portland, Oregon's Washington Park with rolling stock built to 5/8 scale. Opened in three stages in 1958, 1959 and 1960, it provided transportation between the Oregon Zoo, Hoyt Arboretum, International Rose Test Garden, and the World Forestry Center. The extended line was about 2 miles (3.2 km) long. The service is currently operating on a 1-mile (1.6 km) loop within the zoo grounds. The railway carries about 350,000 passengers per year.The railroad is operational year-round except in January and part of February, when it is closed for required maintenance. Special events occur during the winter holidays. As of 2018, the price of a ticket was $4.00 for the short 6 minute internal loop., but zoo admission was also required. Zoo officials announced in September 2013 that the line would be closed for about one year for construction, with the last day of service scheduled to be September 22. The temporary closure was necessitated by the construction of the zoo's new Elephant Lands exhibit, which will also include remodeling of other parts of the zoo grounds. The short-loop route through the southwest part of the zoo grounds was scheduled to be removed permanently, and during the one-year suspension of service a new section of track was to be laid to create a replacement for the short loop. Train operations returned running on the new Zoo Loop line only as of November 22, 2014. In May 2018 an online petition was created in opposition to the Washington Park Master Plan's endorsement to remove the "long route", which runs from the Oregon Zoo to the International Rose Test Garden. The master plan primarily called for the removal of all tracks so that it could be replaced by a paved twelve foot (12') wide path. As of May 2020, over 37,000 people have signed the online petition in support of keeping and repairing the, "long route".